Baseline building: daylight controls
NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Hi,
my question is related with the need to consider (or not) daylight controls in baseline building. Table G3.1 (bullet 6) from ASHRAE 90.1-2010 states the following:
LEED On Line Not Working
NC-v4 EAp2:Minimum energy performanceposted by Ciaran McCabe on
I presume others are experiencing LEED On Line not working and saying "We will be back soon! We are performing maintenance and will be back online shortly".
LEEDv4 New construction - hotels, dormitory, multifamily
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings,
We are to create an energy model for a 8 floor building, which will be partially hotel, partially family apartments.
Lighting Power Density Allowance for covered parking areas
NC-v4 EAp2:Minimum energy performanceposted by Thanh Le on
I have a project with covered parking areas. In ASHRAE 2010 - Table 9.4.3B, there is no category for covered parking areas. How can I determine LPD Allowance for this area?
Thanks!
ASHRAE Lighting Mandatory Requirements for Projects Outside the US
NC-v4 EAp2:Minimum energy performanceposted by Donn Doe on
Good Day,
We are working on a project outside the US and would like to clarify if there are any options that speak to the following;
Penitentiary Confinement Cells -- Considered Residential or Nonresidential?
NC-v4 EAp2:Minimum energy performanceposted by Pooja Sannamani on
Hello,
Does anyone know if penitentiary confinement cells are considered residential or nonresidential per Appendix G when choosing the Baseline system type?
Setback requirement
NC-v4 EAp2:Minimum energy performanceposted by Sofia Barahona on
Hi,
We are working on an office building where some private offices are served by split system. How does the setback requirement is met on these specific HVAC system?
Water-Side HVAC calculator Baseline and Proposed model inputs
NC-v4 EAp2:Minimum energy performanceposted by Norbert Harmathy on
Dear Sir/Madam,
Heat Recovery Exceptions - Baseline Adjustments
NC-v4 EAp2:Minimum energy performanceposted by RDK E&S on
Hi, I'm working on a 2-story 140,000 sf manufacturing facility and wanted some feedback on how to best set up the Baseline. The facility is compromised of a significant amount of office, wareh
Exceptional Calculation Method /Ashrae Appendix G2.5
NC-v4 EAp2:Minimum energy performanceposted by Benjamin Weise on
Hello,