Forum quick links
HVAC Baseline System 8 - with Purchased Chilled Water only
NC-v4 EAp2:Minimum energy performanceposted by Amgad Khattab on
We are working on a project where the selected baseline HVAC system type is 8 with purchased chilled water only from a district cooling plant.
Multifamily Setpoints and Equipment Load
NC-v4 EAp2:Minimum energy performanceposted by Cory Duggin on
Are we required to use the equipment loads and setpoints from the Energy Star Multifamily High Rise Simulation Guidelines? I found that it is referenced by LEED for Homes, but I haven't found
Losses through tank in HW loop
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
ASHRAE 90.1 states:
G3.1.3.6 Piping Losses losses shall not be modeled in either the proposed or baseline
building designs for hot water, chilled water, or steam piping.
Fuel in baseline when proposed design uses renewables for process energy
NC-v4 EAp2:Minimum energy performanceposted by Patrick Bivona on
Hello,
Alternative Complaince for large energy user
NC-v4 EAp2:Minimum energy performanceposted by Vipul Babriya on
Hello,
ASHRAE 90.1 Appendix G Fan Power Calculator
NC-v4 EAp2:Minimum energy performanceposted by Marcus Sheffer on
7group has updated their baseline fan power calculator to include ASHRAE 90.1-2010, 2013 and 2016 baseline fan power calculations. You can download it for free in the Documentation Toolkit tab.
Major renovation - new construction
NC-v4 EAp2:Minimum energy performanceposted by Maria Perzon on
What is the definition of major renovation for this credit?
90.1 2010: V4: Baseline Lighting Control
NC-v4 EAp2:Minimum energy performanceposted by Adrien Dumolard on
Hello, I work on my first PRM. In the 9.4.1.2 mandatory provisions, the standart say: "The controlled lighting shall have at least one control step between 30% and 70% (inclusive) of full lighting
Fenestration - Baseline vs. Proposed
NC-v4 EAp2:Minimum energy performanceposted by Fábio Batista on
Hi all,
I have 3 questions to ask:
1.