Account for local and utility central energy plants
NC-v4 EAp2:Minimum energy performanceposted by S. Sachs on
We are building an addition to an existing building that has a central plant that is outside of our LEED boundary. However, we also have a contract to improve the performance of the central plant.
Data Center Baseline HVAC System
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Hi Markus, Thanks for your reply. I've been trying to undestand the explanation of 90.1-2013 User's Manual, page G-35.
Industrial facility in ASHRAE 90.1 2010
NC-v4 EAp2:Minimum energy performanceposted by Richard Bartlett on
We are designing a research and development facility for an equipment manufacturer and trying to pursue LEED certification for the facility.
Thank you USGBC for Energy Performance Calculator
NC-v4 EAp2:Minimum energy performanceposted by Jean Marais on
Thank you USGBC for Energy Performance Calculator. I remember the days before...where you had to make your own more or less whilst fumbling through projects.
Third Party Review v4?
NC-v4 EAp2:Minimum energy performanceposted by SBS Department on
Does anyone know if either prereq EA - Minimum Energy Performance, or the Optimize Energy Performance credit need a third party review as it did under the CaGBC's LEED 2009?
Manufacturing process
NC-v4 EAp2:Minimum energy performanceposted by ignacio furniés on
My question is regarding the EAp2 and EAc3, our project consists of a palm oil manufacturing facility.
Elementary School
NC-v4 EAp2:Minimum energy performanceposted by K Nakamura on
Is there any special considerations for a project registered (v2.2) and designed 10 years ago is now being constructed. V2.2 and v2009 have expired so we need to register it for v4.
Baseline system selection
NC-v4 EAp2:Minimum energy performanceposted by Gaston Michaud on
Hello everyone, We are working with a building that has a complicated geometry, and the selection of the baseline system is not that evident.
Minimum Energy Performance Calculator - Receptacle Equipment
NC-v4 EAp2:Minimum energy performanceposted by Mark Zoeteman on
Minimum Energy Performance Calculator on process loads tab under receptacle equipment modeling methods paragraph indicates there are three options to model receptacle equipment: average equipment p
Fresh Air & R-Values
NC-v4 EAp2:Minimum energy performanceposted by Muzammal Abbas on
Dear All, I want to know that is it mandatory in LEED that we must have a fresh air in each occupied spaces of a project OR we can comply just by providing overall fresh air of the project accordi