Forum quick links
Modeling Baseline system for an Aquatic center
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi , I am modeling an aquatic center for LEED V4, with the floor having radiant heating , what should be the baseline system for radiant heating for floors in baseline?
LEED requirements for kitchens
NC-v4 EAp2:Minimum energy performanceposted by Gabriela Mesquita on
What are the LEED certification requirements for an industrial kitchen/dining room?
Baseline and Proposed Constructions for a building constructed in 1970 for ID+C Project
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi,
DES Path 1: ASHRAE 90.1 Points Cap
NC-v4 EAp2:Minimum energy performanceposted by Junaid Mujahid on
Hi All,
Is there a points cap when using DES Whole Building Simulation Path 1 in LEED v4? This is stated in the v2009 credit language but have not found it anywhere in v4.
Total annual energy consumption in complex railway station in India
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
The railway station has one entry building which is connecting by foot over bridge with platforms.
Regarding ASHRAE 90.1 2013 Fan Power Calculator_Excel Sheet
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello Everyone,
Can anyone share me the ASHRAE 90.1 2013 Fan Power Calculator excel sheet for baseline model. I am unable to find it anywhere.
Taking account for thermal brigdingt of construction joints/egde
NC-v4 EAp2:Minimum energy performanceposted by Sonja Kildishev on
I wonder if/how thermal bridging of joints/egde between constructions should be included in the U-value of the construction?
Regarding discrepancy in wall area for Baseline Model WWR<=40%
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello,
We have modelled(proposed) a complex railway station having different wall areas on all the 4 sides of the structure. The simulated report provides the WWR of 47%.