NC-v4 EAc2:Optimize energy performanceposted by Gabriela Mena on
Hi, We are working in a Core and Shell project that was registered after april, 2016, from that date to comply with the pre requisite we need to achieve at least 14% savings, We want to know if th
New and Renovation: How to Determine Points from Table 1
NC-v4 EAc2:Optimize energy performanceposted by James Keohane on
I am working on a project that is approx. 24,600sf which includes 11,600s.f. of major renovation with 13,000s.f new construction.
DEMAND RESPONSE energy modeling
NC-v4 EAc2:Optimize energy performanceposted by Habitech Distretto Tecnologico Trentino on
How is it possible to take advantage of energy use reduction due to DR systems in EAp2-EAc1 energy modeling? Is there any reference guide or document as those for the "key cards" for example?
ASHRAE Advanced Energy Design Guide - Option 2
NC-v4 EAc2:Optimize energy performanceposted by Aaron Wascher on
Does anyone know if this applies to new construction only or do renovated spaces need to be upgraded to meet this? My project is 17% new/83% renovation.
Renewable Energy Cost Saving for LEEDv4
NC-v4 EAc2:Optimize energy performanceposted by Daniel Ohnuma on
The LEED v4 Guide steps that it's possible only apply any savings from ON-SITE renewable energy systems?
Heated Bus Storage
NC-v4 EAc2:Optimize energy performanceposted by Victoria Watson on
Hi, I am trying to work out the best way to model a heated (cold climate) bus storage facility in the baseline.
Process - Transport Refinery Energy
NC-v4 EAc2:Optimize energy performanceposted by Victoria Watson on
Hi, Is there any precedent for being able to exclude fuel refinery energy from an energy model.
CS Alternative Compliance Path
NC-v4 EAc2:Optimize energy performanceposted by Joan Kelsch on
Will the LEED CS 2009 Alternative Compliance Path continue through to LEED version 4?
Process loads
NC-v4 EAc2:Optimize energy performanceposted by Ake Larsson on
In our company, we have introduced LEED as mandatory for all new construction projects.