Forum quick links
Alternative Daily Cover - definition?
NC-v4 MRc5:Construction and demolition waste managementposted by Helen Kessler on
I just heard from someone at Greenbuild that construction/demolition waste that is used as roadbed for a landfill (defined as landfill roadbed) could be counted as recycled waste (maybe even anothe
Furniture
NC-v4 MRc5:Construction and demolition waste managementposted by Alexandra Kravel on
We are working on a partial renovation for a college building.
Waste Hauler
NC-v4 MRc5:Construction and demolition waste managementposted by Stacey Schmidt on
I work for a waste hauler and am trying to figure out if there is any certification that we need in order to help LEED builders.
Commingled Waste v4 Documentation
NC-v4 MRc5:Construction and demolition waste managementposted by Samantha Lee on
What is required to be submitted for commingled waste in LEED Version 4? Does the commingled waste have to sent to a Certified Recycling Institute?
Path 1. Divert 50% and Two Material Streams (1 point)
NC-v4 MRc5:Construction and demolition waste managementposted by Ayman Khulief on
Hello!
Demolition of existing building
NC-v4 MRc5:Construction and demolition waste managementposted by Erik Heck on
We have a project which will be built on the site of an existing building. Does the demolition of that existing building need to be included in the MRc5 waste diversion calculations?
Existing steel structure
NC-v4 MRc5:Construction and demolition waste managementposted by Linda Davisson on
Can a building reusing existing steel structure claim the material (or any other existing materials to remain) as contributing to the calculations for waste being diverted away from landfill?
Waste Prevention
NC-v4 MRc5:Construction and demolition waste managementposted by Dave Hubka on
Has anyone successfully quantified and documented substantial waste prevention strategies?
Comingled Waste going to Different Recycling Facilities
NC-v4 MRc5:Construction and demolition waste managementposted by Francis Chua on
Hi. The waste subcontractor on my project has sent comingled waste to (3) different recycling facilities.
Commingled waste as one or multiple material streams?
NC-v4 MRc5:Construction and demolition waste managementposted by Janika McFeely on
The definition of materials streams states: "A material stream is defined as a flow of materials coming from a job site into markets for building materials.