Post a question or comment
Credit Filters
Whole building life cycle assessment
Filter by location
Forum
Topic
Replies
Recent

Tools and flexibility

Pilot-Credits MRpc63:Whole building life cycle assessment
posted by  Devani PERERA  on 

There are secral tools that can be used for LCA but it appears that some tools are more detailed than others. In europe the calculation methods seems to go into great detail.

0

LCA Question

Pilot-Credits MRpc63:Whole building life cycle assessment
posted by  Ronnie Oleary  on 

I had a designer come back from Green Build talking about life cycle assessments for individual furniture pieces. Free standing desks, tables, and office furniture in general.

1
Thu Dec 13, 2012, 9:18 pm

Reference Building – Try #2

Pilot-Credits MRpc63:Whole building life cycle assessment
posted by  Dirk Kestner  on 

Resurrecting Mark Webster’s previous thread – I am finalizing a PC 63 submission and I’m curious what strategy others have used to define the reference building.

1
Sun Apr 12, 2015, 10:45 am

Whole Building LCA as Innovation in Design point?

Pilot-Credits MRpc63:Whole building life cycle assessment
posted by  Alexandra Ramsden  on 

Two questions: 1) Is it acceptable to submit this as an ID point, outside of the pilot process?

1
Thu Jul 12, 2012, 2:39 pm

Whole building LCA - embodied and operational impacts

Pilot-Credits MRpc63:Whole building life cycle assessment
posted by  Henrique Mendonca  on 

Let’s suppose a building is designed to use a material that although it has high embodied energy (concrete), it will improve the operational thermal performance due to thermal mass and the overall

1
Wed Jan 18, 2017, 11:44 pm