Forum quick links
No Mow Grass
Schools-NC-v4 SSc2:Site development - protect or restore habitatposted by Cynthia Kaplan on
Can my school project utilize No Mow grass as part of our site restoration, or would this still be considered a monoculture?
Modeling baseline building envelope for CI project, Purchased energy (condenser water)
CI-v4 EAp2:Minimum energy performanceposted by Yousef Abougabal on
Project Type: LEED ID+C (CI) Version 4
Energy & Atmosphere, EAp2: Minimum Energy Performance & EA Credit: Optimize Energy Performance
Solar powered parking lot lights
NC-v4 EAc5:Renewable energy productionposted by Jason Garvens on
Would dedicated solar powered parking lot lights help contribute toward obtaining x% of the buildings annual energy cost covered by renewable energy?
INDIA ACP Interior lighting
NC-v4 EQc6:Interior lightingposted by Lalitya Reddy on
Hello LEEDusers,
I am looking for guidance on Interior Lighting credit in LEED v4 and v4.1
Direction for testing new and retrofitted equipment
CI-v4 EAc1:Enhanced commissioningposted by Francesco Passerini on
Dear all,
Among the content that is request for the Ongoing Cx plan the following one is specified by the ID+C Reference guide: “Direction for testing new and retrofitted equipment”.
LEEDonline: uploading documents in master site
NC-v4 LTc6:Bicycle facilitiesposted by N. Josef Nassif on
Accroding to Guide Campus approach, it states the following:
Food and beberage tenant lease agreement
CS-v4 EQp1:Minimum indoor air quality performanceposted by Julio Fernandez Amodia on
Hi to all,
Vegetated buffer space qualifying as accessible space?
NC-v4 SSc3:Open spaceposted by Chris Flint Chatto on
How much of vegetation on either side of path can count as qualifying open space? it is clear from the credit that on site with a path through a garden, the entirety of the garden could quali
Need to clarify about energy simulation
CI-v4 EAc2:Optimize energy performanceposted by Nagaraj Sankar on
Modeling Proposed and Baseline System
CI-v4 EAc2:Optimize energy performanceposted by Rajat Wadhwa on
Hi Everyone, I am working on a 10,000 sqft tenant fit out LEED project, the building is close to 250,000 sqft building with 5 stories.