Forum quick links
Greenhouse - SRI Value
NC-v4 SSc5:Heat island reductionposted by Irene Chung on
Can a greenhouse be excluded when doing credit calculation? If not, is there a default SRI that we can use for greenhouse roofs?
Model service infrastructure for energy simulation
NC-v4 EAp2:Minimum energy performanceposted by Linh Dang on
Dear all
Street Light BUG Rating
NC-v4 SSc6:Light pollution reductionposted by Danielle Waters on
If Street Lights on the public sidewalk adjacent to public streets are within project scope and LEED Boundary, are they required to comply with BUG Rating?
Question about calculating the % of Improvement in Energy Performance - Projec with PV arrays
NC-v4 EAc2:Optimize energy performanceposted by Stephan Zweig on
Dear LeedUsers,
In our project we have PV arrays which produce electricity and provide this electricity to the Network.
Waling Distance 400 m or 800 m?
CS-v4 LTc5:Access to quality transitposted by Stephan Zweig on
Dear all,
1) Does subway station as light rail station count? So there applies the limit of 800 m?
RE: v.4 Core & Shell - RECs as Offsite Power
CS-v4 EAc5:Renewable energy productionposted by Yoyo Shek on
Hi LEED user,
We have a C&S project includes retail and office towers with limited space for renewable power generation.
Acoustic Performance Credit for Residences
NC-v4 EQc9:Acoustic performanceposted by Andrew Parise on
Two aspects of this credit seem to make it not achievable for new residential buildings - Reverberation Time <0.6 seconds for residences, and STCc 50 from residences to corridors.
Allocation of User Groups in Elementary Schools
Schools-NC-v4 WEp2:Indoor water use reductionposted by Steven Burke on
Two questions. Question 1: Typically in school projects we have several unisex restrooms without urinals.