Forum quick links
How to determine which rating system in Green vehicles credit is more stringent for Campus project?
NC-v4 LTc8:Green vehiclesposted by Maysoon Al-Khuraissat on
Hi, I'm working on a Campus project that mainly has dormitories, warehouses, services, and offices, the manufacturer's area is almost 65% of the total gross floor area of the campus.
Hot-Dipped Galvanized Metal inherently non-emitting?
NC-v4 EQc2:Low emitting materialsposted by Heather DeGrella on
Inherently non-emitting sources cover materials such as "stone, ceramic,powder-coated metals, plated or anodized metal, glass, concrete, clay brick, unfinished or untreated solid woo
Clean Room HVAC as process load?
NC-v4 EAp2:Minimum energy performanceposted by Maria Papiez on
We are working on a project that includes spaces used to manufacture healthcare instrumentation in a clean room environment. The client’s Engineering Standards as well as ISO 14644-1 Standard
Voltage Drop // mandatory provisions ASHRAE 90.1 - 2010 - ADDENDA 10218
NC-v4 EAp2:Minimum energy performanceposted by Sara BENLOUBA on
Hello everybody,
We are working on a project under LEED V4 certification.
Partial use of Plant equipment for LEED certification
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings,
No cooling tower - ACP
NC-v4 WEc3:Cooling tower water useposted by Charalampos Giannikopoulos on
Hi all!
Proposed interior lighting power allowance
NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Hello,
Table 6.5.3.1.1A Maximum allowed fan power
CS-v4 EAc2:Optimize energy performanceposted by Sarah Leenknegt on
Hi
Frequency of inspections
NC-v4 SSp1:Construction activity pollution preventionposted by Maria Porter on
We got a review comment: “Provide additional documentation to confirm that the project meets the requirements for reductions in inspection frequency (Section 4.1.4 of the EPA Construction Gener
How to determine which rating system in Green vehicles credit is more stringent for Campus project?
Warehouses-NC-v4 LTc8:Green vehiclesposted by Maysoon Al-Khuraissat on
Hi, I'm working on a Campus project that mainly has dormitories, warehouses, services, and offices, the manufacturer's area is almost 65% of the total gross floor area of the campus.