CO2 Sensors being connected to the BMS System of the building
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Aishwarya Chengappa on
We have a project that consists of majorly tenant fit outs and all the densely occupied spaces within these areas will have CO2 sensors.
Energy simulation schedules and HVAC control
Hospitality-NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Hello,
we’re currently simulating an hotel building pursuing LEED v4 Certification. Regarding the simulation procedures, we have two questions:
Quality Views from 75% of a shop or a supermarket
Retail-NC-v4 EQc8:Quality viewsposted by Martin Maribo on
Has anyone had experience with achieving points in this credit?
Commingled waste sorted off-site
CI-v4 MRp1:Storage and collection of recyclablesposted by Pooja Sannamani on
Would be acceptable to have 1 bin for commingled recyclable waste (+ 1 bin for e-waste + 1 bin for batteries) and a waste contract that confirmes that commingled recyclable waste is sorted int
Green Power contract engagement question
NC-v4 EAc7:Green power and carbon offsetsposted by Norbert Harmathy on
Hello,
We want to apply for the Green Power and Carbon Offset credits under LEED v4 BD+C New Construction & Major renovation project.
Table 7.8 DHW performance requirements for electric instantaneous water heater
NC-v4 EAc2:Optimize energy performanceposted by on
I see there is "Gas Instantaneous Water Heaters" in Table 7.8, but there is not an "Electric Instantaneous Water Heater" in the table. Is the "Electric Water Heaters" term meant to be generic
Piping Insulation
NC-v4 EQc2:Low emitting materialsposted by Megan White on
For new construction projects, the Ref Guide excludes insulation around HVAC ducts from the IEQc2 requirements (p.668).
Demand Response for Residential buildings
NC-v4 EAc4:Demand responseposted by Amanda Cunningham on
Has anyone pursued this credit for a multifamily building? I'm assuming the automated demand response would only apply to common areas under the building management's control.
Should archaeological works, taking place before construction start, be included in ESC Plan?
NC-v4 SSp1:Construction activity pollution preventionposted by Agata Mozer on
Dear All,
Can you round percentages on indoor water use reduction?
NC-v4 WEc2:Indoor water use reductionposted by Nate Shroyer on
Hi! Our project is currently meeting 49.95% reduction on indoor water use. Does anyone have any experience about whether it is possible to round this up to 50% for the maximum of 6 poin