Surrounding Density and Military Barracks

NC-v4 LTc4:Surrounding density and diverse uses
posted by  Anthony Taibi  on 

the dwelling unit factor is determined by the zoning- correct?

what is the zoning for military bases?  we work on barracks.

 

3
Sustainability Manager and Architect
Pope Design Group
LEEDuser Basic Member
47 thumbs up
Fri Nov 18, 2022, 9:47 pm

Exhaust energy recovery units

NC-v4 EAp2:Minimum energy performance
posted by  Samer Hassanie  on 

Hi,

We have been getting the following comment from several reviewers:

1
Fri Dec 16, 2022, 1:32 pm

Does Boston's MBTA Silver Line count as Bus Rapid Transit?

NC-v4 LTc5:Access to quality transit
posted by  Eric Dammeyer  on 

Our team is working on a project in Boston located near the MBTA Silver Line (0.46 miles from the Silver Line Way stop).

0

LEEDv4 MRc1 Option 4 Whole-Building Life-Cycle Assessment

Schools-NC-v4 MRc1:Building life-cycle impact reduction
posted by  Theresa Lehman  on 

Has anyone used any life-cycle assessment software? If so, what was the software? How long did it take to produce an assessment? What the software free?

4
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Thu Nov 17, 2022, 2:30 pm

Seasonal Commissioning

NC-v4 EAc1:Enhanced commissioning
posted by  komal m  on 

Is seasonal commissioning required or optional for proejcts? Is seasonal commisioning applicable for tropical areas, as there is hardly any seasonal variation observed throughout the year?

0

Area used in calculation?

NC-v4 LTc7:Reduced parking footprint
posted by  Dave Hubka  on 

When registering a project in LEED Online the gross floor area is used. Gross floor area is calculated from the exterior walls. https://usgbc.org/glossary#gross-floor-area-gfa

2
Wed Nov 16, 2022, 7:27 pm

LEED ND GIBp1 - WELL Building Certification

ND-v4 GIBp1:Certified green building
posted by  Jennifer Bryant  on 

Would certification of buildings within the masterplan under the IWBI's WELL Building Standard V2 be sufficient to fulfil the requirements of this credit?

0
1
Fri Dec 16, 2022, 1:11 pm

Cx scope for ventilation, air conditioners of the base building

CI-v4 EAp1:Fundamental commissioning and verification
posted by  Michael   on 

My store project is located inside a big department store in Japan. All HVAC system in my project is controlled by the landlord of the base building.

0

Is a combination possible?

NC-v4 EAc7:Green power and carbon offsets
posted by  Garrett Ferguson  on 

We have a project that purchases electricity from their local utility provider, which provides just over 33% green-e certified green power to their customers.

1