Forum quick links
Surrounding Density and Military Barracks
NC-v4 LTc4:Surrounding density and diverse usesposted by Anthony Taibi on
the dwelling unit factor is determined by the zoning- correct?
what is the zoning for military bases? we work on barracks.
Exhaust energy recovery units
NC-v4 EAp2:Minimum energy performanceposted by Samer Hassanie on
Hi,
We have been getting the following comment from several reviewers:
Does Boston's MBTA Silver Line count as Bus Rapid Transit?
NC-v4 LTc5:Access to quality transitposted by Eric Dammeyer on
Our team is working on a project in Boston located near the MBTA Silver Line (0.46 miles from the Silver Line Way stop).
LEEDv4 MRc1 Option 4 Whole-Building Life-Cycle Assessment
Schools-NC-v4 MRc1:Building life-cycle impact reductionposted by Theresa Lehman on
Has anyone used any life-cycle assessment software? If so, what was the software? How long did it take to produce an assessment? What the software free?
Seasonal Commissioning
NC-v4 EAc1:Enhanced commissioningposted by komal m on
Is seasonal commissioning required or optional for proejcts? Is seasonal commisioning applicable for tropical areas, as there is hardly any seasonal variation observed throughout the year?
Area used in calculation?
NC-v4 LTc7:Reduced parking footprintposted by Dave Hubka on
When registering a project in LEED Online the gross floor area is used. Gross floor area is calculated from the exterior walls. https://usgbc.org/glossary#gross-floor-area-gfa
LEED ND GIBp1 - WELL Building Certification
ND-v4 GIBp1:Certified green buildingposted by Jennifer Bryant on
Would certification of buildings within the masterplan under the IWBI's WELL Building Standard V2 be sufficient to fulfil the requirements of this credit?
Baseline SFP for tenant fan-coils
CS-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Dear all,
Cx scope for ventilation, air conditioners of the base building
CI-v4 EAp1:Fundamental commissioning and verificationposted by Michael on
My store project is located inside a big department store in Japan. All HVAC system in my project is controlled by the landlord of the base building.
Is a combination possible?
NC-v4 EAc7:Green power and carbon offsetsposted by Garrett Ferguson on
We have a project that purchases electricity from their local utility provider, which provides just over 33% green-e certified green power to their customers.