Low Construction Waste Diversion Rate
NC-v4 MRp2:Construction and demolition waste management planningposted by Jason Cocek on
I have a project located in an area without access to good construction waste recycling services and the best option is to haul waste more than two hours away from the site.
EBOM-v4 WEp1 - option 1 - Design flush rates
EBOM-v4 WEp1:Indoor water use reductionposted by Raquel Viula on
Hello, would anyone know what is the approach to take in oder to identify the Design Flush Rates for fixtures that one does know the make and have no specifications for, in order to perfrom the cal
Pre-Rinse Spray in Pet Spa
NC-v4 WEp2:Indoor water use reductionposted by Danielle Waters on
Do pre-rinse spray valves in amenity Pet Spas have to comply with the < 1.3 gpm requirement?
FTE for multiple shifts calculation (Dormitories and manufactures complicated case)
NC-v4 WEc2:Indoor water use reductionposted by Maysoon Al-Khuraissat on
Hello everyone, I'm working on a campus project that has 2 shifts with 12 hours of work per shift (day shift from 6:30 A.M till 6:30 P.M) and (night shift from 6:30 P.M till 6:30 A.M).
No-irrigation documentation
NC-v4 WEp1:Outdoor water use reductionposted by Alexia Anastassiadis on
Hi all,
What sort of documentation do you submitt to demonstrate no need for irrigation in international projects? (i.e. we don´t have a tool like the USDA hardiness zones)
Clean room ventilation and systems - Process Load
NC-v4 EAp2:Minimum energy performanceposted by Luis Andrade on
Hi all,
Prerequisite - parking garage ventilation
Hospitality-NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Lupoi on
Our specific concern is the ventilation of the parking garage.
"external" process energy for airports - jet bridges, ground power units, andpreconditioned air units
NC-v4 EAp2:Minimum energy performanceposted by Moses Chong on
Hello,
CO2 Sensors being connected to the BMS System of the building
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Aishwarya Chengappa on
We have a project that consists of majorly tenant fit outs and all the densely occupied spaces within these areas will have CO2 sensors.