Forum quick links
Translucent fixture for strategy D
NC-v4 EQc6:Interior lightingposted by Omar Elrawy on
IF I have a lighting fixture with direct light, however, the fixture's glass is translucent / white glass. i.e.
Water sving are 101% according to calculator
NC-v4 WEp1:Outdoor water use reductionposted by Alexia Anastassiadis on
Hi, I am working on a project in Argentina.
No occupancy nor plumbing fixtures on a Warehouse
NC-v4 WEc2:Indoor water use reductionposted by Instra Ingenieros on
Hello everyone!
MRc3 Sourcing of Raw Materials - purchase of reclaimed brick
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by chuck merritt on
We are currently sourcing materials for the exterior space of our project and were trying to figure out if locally reclaimed belgian blocks would be applicable to the MRc3 Sourcing of Raw Mate
Envelope commissioning report
NC-v4 EAc1:Enhanced commissioningposted by Diana Giraldo on
We have aproject that had envelope comissioning inspecton done, are there any samples of a report or any guidance for the consultant that completed the inspection?
Campus approach
NC-v4 LTc6:Bicycle facilitiesposted by Ricardo Sá on
Dear All,
we are applying the Campus Approach to certify a set of buildings within the same site (using the LEED NC BD+C v4).
Percentage of core&shell floor area in building's gross floor area
CS-v4 EAc7:Green power and carbon offsetsposted by Ricardo Sá on
Dear All,
Calculating Total Required Green Power Quantity for Mixed Use Core and Shell (CS) project
CS-v4 EAc7:Green power and carbon offsetsposted by Josie Plaut on
I'm supporting The HUB RiNo Station project (1000100418 - LEED v4 BD+C: CS ). We are pursuing Green Power and Carbon Offsets credit.