Forum quick links
LT Credit High-Priority Site in outside the U.S
CS-v4 LTc3:High priority siteposted by INAE SUH on
Has anyone earned the credit about high priority site- Option2. Priority designation outside the U.S?
Appliance and Process Water Use
NC-v4 WEc2:Indoor water use reductionposted by Edgar Arevalo on
Just so I'm clear about this particular requirement, do I need to satisfy efficiency compliant appliance(s) in order for the project to be allowed to achieve the maximum amount of points based off
Waste Stream Audit AFTER Performance Period?
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by Heather Enos-Graves on
Once the performance period closed for our project, we realized that we did not divert 75% of ongoing waste as required by the prerequisite.
Does wallcoverings considered a "PRODUCT" by LEED?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Sara BENLOUBA on
Hello everybody,
Does wallcovering considered a ''PRODUCT" for LEED V4?
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Sara BENLOUBA on
Hello everybody,
Entryway system and fire security
Warehouses-NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Helena Garcia on
The project is a warehouse divided in two parts: storage and offices.
Question about Option 4. Parking Under Cover
EBOM-v4 SSc3:Heat island reductionposted by J.W. Shin on
We are working on a LEED O+M: existing building project with a multilevel parking space (10th floor mechanical parking) attached to the main building.