Forum quick links
Bicycle storage & shower facilities for multiple buildings
CS-v4 LTc6:Bicycle facilitiesposted by James Jin on
Hi all,
Problem with Rainfall Event Calculator
NC-v4 SSc4:Rainwater managementposted by Timothy Ian Middleton on
We have just realised that the percentile value given by the LEED Rainfall Event Calculator (https://www.usgbc.org/resources/leed-v4-rainfall-events-calculator) was incorrect, just before implement
Baseline System for District Energy System (DES) Option 2
NC-v4 EAc2:Optimize energy performanceposted by Keith Lane on
I'm working on a 73,000 s.f. clasroom building that has air-cooled chiller and boiler plants connected to a seperate building so need to follow the DES guidelines.
Selection of baseline system type for industrial object - Number of floors Vs area
NC-v4 EAp2:Minimum energy performanceposted by Anna Korinkova on
Hello everyone,
Modification of the lighting boundary - 4 lane street
NC-v4 SSc6:Light pollution reductionposted by Anna Korinkova on
Hello everyone,
I would like to ask for a clarification related to the allowed modification of the lighting boundary.
V4 BDC Multifamily Midrise LEED AP Homes point out of reach
NC-v4 INc2:LEED Accredited Professionalposted by Sue Bryant on
The V4 requirement is for a LEED AP Homes to be on the project team. That team member, however, cannot be part of the verification team.
CO2 Sensors for Phonebooths
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by LEED Pro Consultant on
Hello our project is 3 office floors with some spaces destined only for phonebooths wich are only designed for 1 person, however because of the small area the calculations to obtain occu
What threshold of reverberation time to apply for Performing arts Space / ballroom?
NC-v4 EQc9:Acoustic performanceposted by Sara BENLOUBA on
Hi everybody,
Bus Park
Schools-NC-v4 LTc8:Green vehiclesposted by Priscillia Champagne on
For our school we have a car park (230 spaces) and a bus park (80 spaces).
LEED Interpretation 10463
CS-v4 EAp2:Minimum energy performanceposted by Dave Hubka on
It is a big box 'speculative warehouse' that is pursuing Core & Shell cert since there are no restrooms, no office buildouts, etc. within the CS scope of work.