Forum quick links
Recycling rate of construction and demolition waste
CS-v4 MRc5:Construction and demolition waste managementposted by Tiago Rigobello on
How can we prove the recycling rate of construction and demolition waste made by the recycler? What are the options in Brazil?
Thanks! Best regards!
Demand response Path 2 in Europe
NC-v4 EAc4:Demand responseposted by Julio Fernandez Amodia on
Hi there,
Are Coco Mats accepted as entryway mats?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Jason Franken on
Has anyone had success using coco mats (made from material derived from coconut husks) as the entryway system? I know that GBCI has been picky about carpet tile products being specifically de
Using LEED Min IAQ Performance Calculator for LEED-HC v4
Healthcare-v4 EQp1:Minimum indoor air quality performanceposted by Mark Benson on
The new USGBC-provided "Minimum IAQ Performance Calculator" appears to be applicable to LEED 2009 and LEED v4 projects in that it includes calculations for ASHRAE 62.1-2007 and 2010.
how to justify the conformity of our dishwashers with energy star while knowing that they do not hold the ENERGY STAR certific?
NC-v4 WEc2:Indoor water use reductionposted by Sara BENLOUBA on
Hello everyone,
how to justify the conformity of our dishwashers with energy star while knowing that they do not hold the ENERGY STAR certific?
NC-v4 WEc2:Indoor water use reductionposted by Sara BENLOUBA on
Hello everyone,
EPD: products with same technical charachteristics but different thickness, are considered distincts products (BA13/BA15,
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Sara BENLOUBA on
Hello everybody,
Cafeteria with patio seating
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Margaret Montgomery on
In a cafeteria situation where indoor seating bleeds into patio seating with operable windows and person doors between, I assume we still need a walkoff system?
Area behind fiberglass enclosure IF WALLBOARD IS INSTALLED
Homes-v4 MRp2:Durability managementposted by Marijana Misic on
With fiberglass tub surrounds, the flanges are typically attached to the studs, and moisture-resistant wall finish is overlapped above and sealed.
Translucent fixture for strategy D
NC-v4 EQc6:Interior lightingposted by Omar Elrawy on
IF I have a lighting fixture with direct light, however, the fixture's glass is translucent / white glass. i.e.