Forum quick links
GFA calculation for extremely thick walls
NC-v4 IPc1:Integrative processposted by Filippo Weber on
Hi,
Install submeters for a factory with 90% of Process load
NC-v4 EAc3:Advanced energy meteringposted by Michael on
My project is a factory with more than 90% of energy consumption coming from Process load (for production purposes).
Weighted average SRI values for option 2 parking under cover
NC-v4 SSc5:Heat island reductionposted by Julio Fernandez Amodia on
Hi,
CDPH VOC Emissions Certificate Expired
NC-v4 EQc2:Low emitting materialsposted by Peter Doo on
I have a submittal that includes a resinous flooring product for which the CDPH 01350 v1.2-2017 VOC emissions testing certificate expired in September of 2019.
Commitment to Share Data - Military Facility
NC-v4 EAp3:Building-level energy meteringposted by Dane Andersen on
Has anyone worked on LEED certification for a military facility?
eQUEST DOE2.3 for LEED V4 EAp2 and EAc1
NC-v4 EAp2:Minimum energy performanceposted by Vipul Babriya on
Hello Everyone,
EQc4 - IAQ Assessment, Option 1. Flush-Out, Path 1. Before Occupancy
NC-v4 EQc4:Indoor air quality assessmentposted by Theresa Lehman on
If the humidity exceeds the range (higher than 60%) for a couple of hours, can the team simply add those few hours onto the flush-out, or does the flush-out have to start completely over at the tim
Compliant EPR Programs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Amanda Tullos on
Has anyone had luck getting credit for a take back service program like Steelcase's (https://www.steelcase.com/services/#recycle
building on campus with no smoking policy
CI-v4 EQp2:Environmental tobacco smoke controlposted by Megan Valentine on
We are renovating a building on a campus. The campus has a no smoking policy with signage stating the policy at all entrances to the campus.
Campus approach: can we install water meter for the entire landscape, sanitaryware as a whole
NC-v4 WEc4:Water meteringposted by Michael on
My project is a campus project, consisting of 4 individual buildings. To fulfill this credit, can I install 1 meter to monitor sanitaryware for 4 buildings together as a whole?