Operable windows to avoid mechanical ventilation
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Harry Flamm on
The home page for this credit, by Ben Stanley, stated below, mentions an alternative reqmn't allowing for operable windows. Can someone elaborate on this for me?
Water Bottle Filling Stations - Do Green Tickers count as a sub-meter?
NC-v4 WEc4:Water meteringposted by Shana Scheiber on
Has anyone attempted to claim the bottle green ticker feature on water bottle filling stations as a sub-meter for the purposes of the water metering credit under the process water category?
terrazzo resin system
NC-v4 EQc2:Low emitting materialsposted by Tristan Roberts on
Has anyone found a terrazzo resin and sealing system that is LEED v4 compliant, i.e. CDPH, and they're happy with? Thanks!
using HPD as supporting documentation
NC-v4 EQc2:Low emitting materialsposted by Erin Holdenried on
A lot of HPDs indicate the VOC content of a product and/or the emissions compliance (such as Greenguard Gold). Would an HPD be accepted as supporting documentation from this credit, part
Total Site Paving Area
NC-v4 SSc5:Heat island reductionposted by Maria Perzon on
I am not sure about the definition of "Total Site Paving Area". I have a already developed site with a building that is to be majorly rebuilt. Could I use the old site paving area as my reference?
Demand response infrastructure associated costs
NC-v4 EAc4:Demand responseposted by Julio Fernandez Amodia on
Hi there,
I am currently assessing the feasibility of this credit. As per now I am aiming for Case 2. since there is no know DR program available.
RECs - projects outside the U.S.
NC-v4 EAc7:Green power and carbon offsetsposted by Camila Rossini on
Could anyone help me verfify if the following understandig is correct? Tks!
Perimeter area calculation
Healthcare-v4 EQc7:Daylightposted by Priscillia Champagne on
Does anyone know if the perimeter area to be used for Healthcare projects excludes from the calculations the non-regularly occupied space within that perimeter, or do we need to include the whole a
Fire Treated Plywood - how to document PS 1 or PS 2 standard?
NC-v4 EQc2:Low emitting materialsposted by Erin Holdenried on
Anybody have advice on how to document a plywood product is manufactured to PS-1 or PS-2 standard for fire treated products? I am getting pushback from GBCI for Hoover Pyro-guard products.
Data Center load for Renewable Energy design
Data-Centers-NC-v4 EAc2:Optimize energy performanceposted by Instra Ingenieros on
We have a question about the energy simulation of a Data Center. We have completed the v4 Minimum Energy Performance Calculator introducing full IT and initial IT loads.