Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Tenants installing glare control devices

CS-v4 EQc4:Daylight
posted by  Ricardo Sá  on 

According to Reference Guide, manual or automatic (with manual override) glare-control devices shall be provided for all regularly occupied spaces in order to comply with credit requirements.

7
Wed Jun 1, 2022, 1:54 am

Use of alternative standards - UK

CI-v4 EQc9:Acoustic performance
posted by  R Jones  on 

Hi - what other standards are allowed as an equivalent to the ASHRAE standard? is the British Council for Offices (BCO) guidance accepted for all parts ?

 

thanks 

0

furniture reused

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Priscillia Champagne  on 

Hi, for a new school project, the client wants to recuperate a large part of his furniture not integrated to the building to reuse it (like desk).  For the raw material supply credit, it is sp

1
Tue May 31, 2022, 4:06 pm

Emergency generator building

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Priscillia Champagne  on 

I am starting a project in which we are building a new addition to an existing hospital which will be approx. 30 000 m2 (considered separate building from existing hospital).

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Mon May 30, 2022, 1:07 pm

New addition with separate air distribution systems also feeding renovation portion of existing hospital

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Priscillia Champagne  on 

We are planning to register a new project for LEED certification, but we need to make sure that we can comply with the minimum program requirement #2 beforehand.

0

Is it applicable for a historic wall project to obtain LEED New Construction BD+C Certification?

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Amgad Khattab  on 

Is it applicable for a historic wall project to obtain LEED New Construction BD+C Certification?

0

Restore habitat overlap with rainwater infiltration

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Andrea Vickers  on 

I'd like your opinions on a phrase in Protect or Restore Habitat: "Project teams may exclude vegetated landscape areas that are constructed to accommodate rainwater infiltration from the vegetation

2
Director of Sustainability
Flad
LEEDuser Premium Member
0 thumbs up
Tue May 24, 2022, 3:45 pm

Documentation of savings using alternative water sources

EBOM-v4 WEc2:Indoor water use reduction
posted by  Noriko Nagazumi  on 

Hello! The calculation of savings due to alternative water sources seems to be missing from the calculator and online form.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Mon May 23, 2022, 6:58 am

Landscape in ground mounting - backlight exempt?

NC-v4 SSc6:Light pollution reduction
posted by  Sue Bryant  on 

Facade mounted fixtures are exempt from the B backlight part of the bug rating.

5
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Sat May 21, 2022, 7:21 pm