Forum quick links
PM-10 Testing
NC-v4 EQc4:Indoor air quality assessmentposted by Robert Cashins on
What method of testing have people used to measure airborne PM-10 dust required as part of V4 IEQ Credit 3.2?
Is real time monitoring acceptable?
Advanced Energy Design Guide for Small Warehouses and Self-storage - 50% Energy Savings is Not Available
Warehouses-NC-v4 EAc2:Optimize energy performanceposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
Hi All,
Balconies overhead
CS-v4 EAc2:Optimize energy performanceposted by Dina El-Sady on
Can balconies overhead act as a projection factor when modeling buildings?
Furniture to include in LEM documentation?
NC-v4 EQc2:Low emitting materialsposted by Erica Downs on
Under v3, only systems furniture and desk/occasional seating were included. Under v4/4.1, is ALL (non-permantly installed) furniture now included? What counts as a piece of furniture?
Print rooms.
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by R Jones on
Our project is intending on containing 2x multifunctional printers within a glass partitioned area (large floor plate so there will be a couple of these on each floor).
Green Cleaning - Equipment - Vacuum Cleaner
EBOM-v4 EQc8:Green cleaning - equipmentposted by DINGTIAN OU on
Do all vacuum cleaners certified by the Carpet and Rug Institute Seal of Approval (CRI) can fulfill the LEED requirement?
Airport base ratio ?
NC-v4 LTc7:Reduced parking footprintposted by Bouygues Sustainability on
Hello - how do i calculate the baseline parking capacity of an airport ? - it is not included in the TABLE 1 - Base Ratios for parking spaces, by building type.
Clean cleaning using Option 2. Certified cleaning service for LEED v4, ID+C as IN credit
CI-v4 INc1:Innovationposted by Courtney Royal on
Is it enough to pursue the EBOM v4 prerequiste, Option 2.
WE Credit 4 requirement question
Healthcare-v4 WEc4:Water meteringposted by Nate Maniktala on
WE credit 4 Water Metering, requires the following. However our building has at most two of the items on the list and the credit requires five.
Firing Range ventilation process loads
NC-v4 EAp2:Minimum energy performanceposted by jorge velasco on
I am currently working on an energy model for a Firing Range building which will pursue V4 BD+C New Construction.