Forum quick links
WC flushing valves to be adjusted manually
NC-v4 WEc2:Indoor water use reductionposted by Victoria Rios Esteve on
Hi everyone! On our project, we have installed wc flushing valves that can be manually adjusted to gain higher water use reduction. This is specified in manufacturer's catalogue.
LEED v4 ID+C_EA energy modeling
CI-v4 EAc2:Optimize energy performanceposted by Dávid Jakab on
Hello LEED experts,
Do you have any common practice regarding the energy modeling in EA (PR and CR)?
Natural ventilation: what output from CFD model we need to show LEED for compliances?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Michael on
Hi LEED experts, my project is a warehouse, they use natural ventilation through a double side louver.
All meters in the system must be capable of reporting hourly, daily, monthly, and annual energy use.
NC-v4 EAc3:Advanced energy meteringposted by Chad Thurlow on
To Whom This May Concern
Freight elevator schedule
Warehouses-NC-v4 EAp2:Minimum energy performanceposted by James Cai on
Hello!
Prescriptive Compliance - Core and Shell
CS-v4 EAp2:Minimum energy performanceposted by Shashank Singh on
Hi Folks,
LEED Campus Matrix
Mid-Rise-v4 MPR2:Must use reasonable LEED boundariesposted by sana salman on
Hi ,
Who can supply Potable water analysis results?
NC-v4 WEc3:Cooling tower water useposted by Alex Edwards on
Hello,
Off Site Renewable Energy Purchase
NC-v4 EAp2:Minimum energy performanceposted by SAMY Chamy on
Dear Concern:-
Option 2 :Only CO2 sensors
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Dina El-Sady on
The project is totally mechanically ventilated .I am choosing adding CO2 sensors in dense areas for option 2 for additional points .What should be done in other small spaces ?Can we only add CO2 se