District cooling chilled water
CS-v4 WEc2:Indoor water use reductionposted by Dina El-Sady on
If the project is served by a district cooling plant outside LEED project boundary , does the chilled water count as process water and needs to be included in water efficiency calculations?
All-Gender Restrooms - Verticality (Locate on all levels or selected levels?)
NC-v4 INc1:Innovationposted by Vijitha Mammen on
We are working on a post-secondary education project incorporating both gendered and all-gender restrooms.
WEp2c2 Indoor Water - calculating urinal access for multiple single user WCs
NC-v4 WEp2:Indoor water use reductionposted by Susan Di Giulio on
Our project is a machine/model-making shop in an art and design college. There are 4, ungendered, single-user bathrooms that all occupants have access to (no other bathrooms).
LOCALIZATION OF STORAGE AND COLLECTION OF RECYCLABLES
Hospitality-NC-v4 MRp1:Storage and collection of recyclablesposted by Andrea gamio on
Well, my answers is about the better location of the dumpsters. Our project is a boutique hotel in the historic neigtboardhood town of spain, and the building is smaller.
Heat Pump Room = Mechanical Room?
NC-v4 EQc9:Acoustic performanceposted by Iris Meeker on
We are trying to determine whether or not a Heat Pump Room would be considered a "Mechanical Room" for purposes of the Acoustic Performance credit?
Does the project scope for kitchen appliances include future tenants?
NC-v4 WEp2:Indoor water use reductionposted by Christoph Keck on
Hi guys,
LT credits for regional priority
NC-v4 LTc1:LEED for Neighborhood Development locationposted by Emily Purcell on
Hi,
ventilation in unheated and uncooled spaces
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
I have doubts relative to the correct intepretation of ASHRAE 62.1 for unheated and uncooled spaces.
The text of ASHRAE is:
6.4 Natural Ventilation Procedure.
Applying the requirements of the Construction General Permit outside of the United States
CS-v4 SSp1:Construction activity pollution preventionposted by Gina Anderson on
Hello everyone!
Production of renewable energy but sent to the grid
NC-v4 EAc5:Renewable energy productionposted by Borja Sánchez on
Hi, I´d like to know what happens when the project owner also owns a PV systems on the project boundary but it´s not been used on the same building and sends all the production to the grid (selling