Forum quick links
Is janitor closet water use considered as Process Water and need to be measured apart of domestic fixtures piping?
NC-v4 WEp3:Building-level water meteringposted by Mauricio Toro on
We have been receiving comments from the LEED reviewer team asking for information to confirm that the non-fixture usage (e.g.
Lighting control for hotel lobby, bar, restaurant
Hospitality-NC-v4 EQc6:Interior lightingposted by Giuseppina Amorusi on
Good morning
I have a question relating lighting control in a hotel building.
HVAC system within the scope of tenant
CS-v4 EAp2:Minimum energy performanceposted by Ashish Nautiyal on
Hello All,
Fire alarm cables (Public Address system) in the hospitals
Healthcare-v4 MRc6:PBT source reduction - lead, cadmium and copperposted by Najam Us Saqib on
Fire alarm cables are same like electrical cables, however, its function is different.
Contractor is not able to comply with Cx Specifications
NC-v4 EAp1:Fundamental commissioning and verificationposted by Timothy Ian Middleton on
We have a project where the contractor is not able to comply with the Cx Specifications and Testing Procedures provided by the CxA.
Which version of V4.1 should I follow ? Do older versions of V4.1 become obsolete when a newer version is released?
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Sara BENLOUBA on
Dear all,
We have a project registered on the V4 version of LEED.
GREEN POWER AND CARBON OFFSETS - 5 years contract
CI-v4 EAc6:Green power and carbon offsetsposted by Russell Fatkoulin on
Hi,
Design of flexibility - Can an open ceiling be counted as an accessible ceiling?
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Michael on
No outdoor lighting?
NC-v4 SSc6:Light pollution reductionposted by Deborah Lucking on
We have a project that has no exterior lighting - not even emergency egress, as the travel paths go through an existing, compliant building.