New WaterSense requirements don't align with LEED v4
NC-v4 WEp2:Indoor water use reductionposted by Bethany Beers on
Has anyone explored the discrepancy that has been created by the new WaterSense requirements for flush fixtures at 1.28 gpf minimum?
Baseline Design Supply Airflow Rate Temperature Difference 90.1-10 para. G3.1.2.9.1
NC-v4 EAp2:Minimum energy performanceposted by Michael Callan on
Hello,
RECs Suppliers
NC-v4 EAc7:Green power and carbon offsetsposted by Charalampos Giannikopoulos on
Hi all! Is there a directory with international suppliers of Green Power certificates (Green-e) for projects located in Europe?
Renovation Project with Zero Lot Line
CS-v4 WEp1:Outdoor water use reductionposted by Somsak Jidmon on
I got a renovation project of the 7 stories existing building to the office which aims to be LEED-CS but the project contains zero lot line. Is it possible to pass this prerequisite? &nb
Negative ETo
CS-v4 WEp1:Outdoor water use reductionposted by Laura Chávez on
I'm using the Outdoor water use reduction calculator_v02 from the resources tab since the project its outside USA.
Mixed Use energy calculations!
Mid-Rise-v4 EAp1:Minimum energy performanceposted by Karen Joslin on
Still confused about how to treat/account for the first floor for the retail/commercial spaces with 4 stories of apartments above.
ASHRAE Standard 90.1 - 2016 in LEED v4
NC-v4 EAp2:Minimum energy performanceposted by Greenlab on
Dear all,
Summary page shows an error
NC-v4 EQp1:Minimum indoor air quality performanceposted by Madhura Dhayagude on
Hello team,
ASTM E1903-97 Phase II Environmental Site Assessment for SSc1 - Site assessment
NC-v4 SSc1: Site assessmentposted by yingling guan on
If our project has done Phase 2 ESA and followed by ASTM Standards E1903, can it be considered to fully meet the requirements of this credit?
Thanks!
Cistern in only one building in campus master site - points only for that building?
NC-v4 SSc4:Rainwater managementposted by Douglas Webber on
I'm working on a complex mixed-use Campus project, where we'd like to pursue this credit for 1 of the separate buildings.