Forum quick links
Sidewalks width
ND-Plan-v4 NPDp1:Walkable streetsposted by Gabriela Mesquita on
Hello, I have a query.
In the Walkable Streets Prerequisite, specifically at point C.
Pass air method
NC-v4 EQp1:Minimum indoor air quality performanceposted by Alex Edwards on
Hello!
Thanks for everyone's help, I have a question about the pass air method
Core and Shell
CS-v4 EAp1:Fundamental commissioning and verificationposted by Bryan Markkanen on
We have a Core & Shell project that is complete but doesn't have tenants. The owner is having problems getting tenants (and their layouts/ HVAC needs) so we don't have a way to test the e
Scope
CI-v4 EAc5:Enhanced refrigerant managementposted by Michael Smithing on
For a CI project with minimal new HVAC equipment is the credit scope limited to equipment within the scope of the project only, or is there a hurdle below which base building equipment must comply
chemical storage cabinet
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Erik Heuler on
Hello,
Preschool child toilet rooms - no urinals
NC-v4 WEp2:Indoor water use reductionposted by Lyle Axelarris on
I'm working on a child care center project, with many toilet rooms designed for preschool-aged children. Since urinals are not appropriate for this occupancy type, should I consider these res
Base building energy sources
CS-v4 EAc3:Advanced energy meteringposted by Ciaran McCabe on
Hi, I just require come clarification on the Base Build systems.
District heating and Cooling
NC-v4 EAp2:Minimum energy performanceposted by Greenlab on
Hello Everyone,
OA Flow to enter in MEPC
CS-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings,
We are facing the following issue, for which we’d need some assistance/advice.
In- or exclude energy use of servers (tenants) in C&S for a datacenter
CS-v4 EAc2:Optimize energy performanceposted by Janine van den Kerkhof on
We are targeting LEED certification for a new Datacenter. Since there are no tenant agreements yet, we using the Core & Shell scheme.