Forum quick links
Is drywall not considered a product for LEED V4 ?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Sara BENLOUBA on
Hello dears,
Is plasterboard / Drywall not considered a product for LEED V4 ?
This is what I understood from the LEED guide, page 469,
is drywall not considered a product for LEED V4?
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Sara BENLOUBA on
Hello Dears,
Is plasterboard / Drywall not considered a product for LEED V4 ?
This is what I understood from the LEED guide, page 469,
Minimum Energy Performance Review Phase
CS-v4 EAp2:Minimum energy performanceposted by Eric Kim on
Hello,
I have a question about the project review.
Our project was conducted by Spilt Review.
Tenant water metering
CS-v4 WEc4:Water meteringposted by Anya Fiechtl on
Can a Core&Shell project achieve this credit by submetering tenant water use?
Is proof of 3rd party Cx of Renewable Energy installations required?
NC-v4 EAc5:Renewable energy productionposted by Joyce Kelly on
Proof of 3rd party Cx was requested by a Reviewer in a 2009 project. I'm no longer seeing this mentioned in v4... or is it implicit?
Glare control devices on interior glazing
NC-v4 EQc7:Daylightposted by Elise Woestyn on
Are glare control devices required only on exterior glazing?
Proposed HVAC system modeling for shell space
CS-v4 EAp2:Minimum energy performanceposted by Eric Dixon on
My question is regarding how the proposed hvac system should be modeled when the C&S design includes a DOAS w/a DX CC and gas HC which is capped at the shafts, therefore there are no ductw
Plan de Contrôle d'Erosion & Sedimentation / Storm Water Prevention Plan
NC-v4 SSp1:Construction activity pollution preventionposted by saif eddine majdaoui on
Does the monitoring of SWPP and PCES have to be carried out every week on LEED certification projects even if in the absence of rainy / weather events (No precipitation / no rain)
DESIGN AND CONSTRUCTION PRELIMINARY REVIEW
CI-v4 EAc2:Optimize energy performanceposted by Zixuan Yuan on
Excuse me, in the supply airflow rate part, it is required that the airflow should be approximately 1 cfm/square feet for the office buildings.
Bird Collision Deterrence – Performance Monitoring Plan
NC-v4 INc1:Innovationposted by Verde Design on
I am currently developing a performance monitoring plan for the Bird Collision Deterrence Pilot Credit and have a couple of questions: