Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent
2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Mon Jan 10, 2022, 12:05 am
1
Fri Jan 14, 2022, 4:07 pm

To use Energy star portfolio manager

Data-Centers-EBOM-v4 EAp2:Minimum energy performance
posted by  Milan Kumawat   on 

We are trying to fill the energy star for data center. If we create a single meter for whole building electricity consumption then our score is not reflecting on energy star portal.

0
1
Thu Feb 17, 2022, 6:58 am

Illuminance Value Calculation

NC-v4 EQc6:Interior lighting
posted by     on 

What program/process is most helpful for caluclating separate illuminance values for ceilings/walls/work surfaces?  I have not been able to track down a process that will allow me to do t

0

Inherently non-emitting: Gypsum board?

CS-v4 EQc2:Low emitting materials
posted by  Ward Miller  on 

The Reference Guide states that materials that are inherently non-emitting do not require additional VOC documentation, but cements, concretes, and gypsum products are not listed.

5
Default Avatar
Senior Project Administrator
Clark Contractors, LLC
LEEDuser Basic Member
3 thumbs up
Thu Jan 6, 2022, 4:00 pm

BD+C vs ID+C Rting System Selection

Retail-CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  Sofia Barahona  on 

We are working on a Retail (fast food store) that is currently in the LEED registration process.

2
Sustainability Consultant
Thornton Tomasetti
LEEDuser Expert
3 thumbs up
Thu Jan 6, 2022, 11:45 am

Area of Trees?

NC-v4 WEp1:Outdoor water use reduction
posted by  Yoyo Shek  on 

Hi All,

I have a very foundatmental question:

2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Wed Jan 5, 2022, 11:30 pm

Automatic Receptacle Controls - IECC 2018 v ASHRAE 90.1-2010

NC-v4 EAp2:Minimum energy performance
posted by  Cindy Quinn  on 

We are working on a project that has to comply with IECC 2018 in order to meet the city’s energy code requirements.

5
Default Avatar
Senior Energy Analyst
Brightworks Sustainability
LEEDuser Basic Member
1 thumbs up
Wed Jan 5, 2022, 10:46 pm

BD+C vs ID+C Rating System Selection

Retail-CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  Sofia Barahona  on 

We are working on a Retail (fast food store) that is currently in the LEED registration process.

0