Is EIFS Considered an Inherently Non Emitting Material
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Melanie Blacklock on
Hi All,
Has anyone found VOC data for an EIFS System or is it considered to be an inherently Non-Emitting Material. It is mainly composed of cement.
Thank you
Is it acceptable to use low-emission printers without providing doors for copy rooms?
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Elisa Somma on
It’s about Option 1, Mechanically ventilated spaces, B. interior cross-contamination prevention.
Exact Definition of LEED project boundary , Property Line
CS-v4 MPR2:Must use reasonable LEED boundariesposted by RAMON CHRISTOPHER MEDRANO on
I have a difficulty in declaring, documenting between the LEED PROJECT BOUNDARY to PROPERTY LINE can you give me the exact definitions of LEED PROJECT BOUN
Metabolic Rates not covered by the referenced standard
NC-v4 EQc5:Thermal comfortposted by Dave Hubka on
The CBE Thermal Comfort Tool LEED allows for analysis of this credit has been updated to ASHRAE Standard 55-2020.
Preparing concept HVAC requirements
NC-v4 EAc2:Optimize energy performanceposted by Dina El-Sady on
Is it a must to start a simple box energy model for a new project to extract HVAC requirements to acheive a certain level of energy savings?
Parking not provided
NC-v4 LTc7:Reduced parking footprintposted by Ana Milinkovic on
Hi everybody.
I have just a simple question. If in my project parking is not provided, can I award this credit?
Project located on reclaimed land
NC-v4 MPR1:Must be in a permanent location on existing landposted by Nermin Hegazy on
I would like to know what is LEED's take on developing a site which is on reclaimed land. The land for the site is not specifically claimed for the project, it has been reclaimed about 1
LEEDv4 HD Quality Views Credit - perimeter area calculation
Healthcare-v4 EQc8:Quality Viewsposted by Tim Hemsath on
Page 740 of reference guide, second paragraph "For other areas, confgure the building foor plates such that the foor area within 15 feet (4.5 meters) of the perimeter exceeds the perimeter area req
Kitchen tab for Core and Shell project
NC-v4 WEc2:Indoor water use reductionposted by Linh Dang on
Hello LEED user experts,
CWMP in ND used for individual buildings (BD+C) within ND boundary?
ND-Plan-v4 GIBc16:Solid waste managementposted by Jackson Ludwig on
Working on an ND project, and curious about the CWMP requirement on this credit. Can this same ND CWMP be used on individual buildilngs pursuing BD+C within the ND boundary for materials