Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Green-e energy certificate accounted for in EA credit - v4 x v4.1

NC-v4 EAc2:Optimize energy performance
posted by  A&L SUSTENTABILIDADE   on 

Our project is registered under the LEED v4, but we have substituted the EAc5 and EAc7 with the EA credit Renewable Energy from LEED v4.1, we intend to use the Tier 2 and purchase Green-e Energy ce

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Apr 1, 2025, 8:24 am

BUG ratings for recessed down lights

NC-v4 SSc6:Light pollution reduction
posted by  Brightworks Sustainability  on 

Hi Bill, Do you know how to account for exterior lighting that does not have published BUG ratings?

4
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Sat Mar 29, 2025, 8:06 am

land clearing debris, soil, etc

NC-v4 MRc5:Construction and demolition waste management
posted by  Jen Roberts  on 

On page 591 of the ref guide, it states ADC does not count as diverted material but must be included in your total construction/demolition waste. What about hazardous waste, land-clearing debris,

5
Default Avatar
LEEDuser Expert
472 thumbs up
Fri Mar 28, 2025, 5:23 am

WEc Water Metering

NC-v4 WEc4:Water metering
posted by  Theresa Lehman  on 

I am working on a homeless shelter project with three large water uses: kitchen, laundry, bathrooms (toilets, sinks & showers) where toilets are on cistern water.

1
Mon Mar 31, 2025, 4:27 pm

Can we use both option 1 and option 2?

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Amanda Cunningham  on 

Hello, 

Has anyone had success achieving 2 points by reaching the 15% threshold for one point and making an off-site financial support donation for a second point?

0
2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Thu Mar 20, 2025, 12:23 pm

Process Chiller in a Lab Building: 90.1-2019 Baseline vs. Proposed

NC-v4 EAp2:Minimum energy performance
posted by  Kristy M. Walson  on 

We're working on a 35,000 SF lab building on a campus district cooling loop. The baseline system type is #5, so there's no chilled water in the baseline.

1
Fri Mar 28, 2025, 2:41 pm
3
Wed Mar 19, 2025, 9:51 pm