Distinct Structures - Pump House
Schools-NC-v4 MPR2:Must use reasonable LEED boundariesposted by Kathryn Haeberle on
We are building a replacement elementary school on an existing school site. The school will get water from new wells we are installing that require a separate 'pump house'. This pump ho
Structural Steel Backup Letters
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Michelle Rosenberger on
We have always used industry standard steel letters as backup for structural steel recycled content from people like Nucor, Atlas Tube, Gerdau, etc.
Exterior Lighting Lamp Life
NC-v4 EQc6:Interior lightingposted by Michelle Halle Stern on
This credit is called Interior Lighting. Option 2 Strategy C says "for total connected lighting load", so does exterior lighting need to be included for lamp life?
surrounding density review comment question
CI-v4 LTc2:Surrounding density and diverse usesposted by Courtney Royal on
Hello!
So I recieved the following review comment for the Option 1, Surrounding Density credit:
Spaces used for business purposes
CS-v4 EQp2:Environmental tobacco smoke controlposted by Andreas Colli on
Our project is an existing building, that is to be renovated in large parts and converted fron retail to office ues.
Recycable waste
EBOM-v4 MRc4:Solid waste management - ongoingposted by Alice Andersen on
I would like to know if small combustible material can be counted as "Recycable" if the waste is transportet to a Power plant that burn the waste and turn it into power?
Existing steel structure
NC-v4 MRc5:Construction and demolition waste managementposted by Linda Davisson on
Can a building reusing existing steel structure claim the material (or any other existing materials to remain) as contributing to the calculations for waste being diverted away from landfill?
Energy Star Protfolio Manager
EBOM-v4 EAp2:Minimum energy performanceposted by Sarfaraj Khan on
Hi Can international project (UAE) attempting LEED V4 O&M can used Energy Star Protfolio Manager Regards
Choose baseline system for CAV factory
NC-v4 EAp2:Minimum energy performanceposted by Hyerim Kim on
I am doing factory served by CAV AHU, cooling only. Constant volume is due to positive pressurization to avoid infiltration.
Green Power Query
NC-v4 EAc7:Green power and carbon offsetsposted by Andrei Sabater on
I am Andrei Sabater, employee of ecoSolutions, Right now we are currently studying the credit for the green power and carbon offsets. Is the credit applicable here in the Philippines?