Forum quick links
Source for Table 1 Maximum Parameters
NC-v4 WEc3:Cooling tower water useposted by Nathan Gauthier on
Does anybody know where USGBC / WE TAG came up with Table 1? I've not been able to find it anywhere, except where it is referenced as coming from LEED.
0.5 PPB above threshold
NC-v4 EQc4:Indoor air quality assessmentposted by Omar Elrawy on
Dear all,
Our IAQ test results show compliance for all parameters except for Fromaldehyde, which is 27.50 PPB , meaning that it is only 0.50 PPB above the threshold.
Marquee sign to be provided at a later time
NC-v4 SSc6:Light pollution reductionposted by Tacy Austin on
The marquee sign is shown on our site plans but the intention is to install at a later date. To receive this credit, what is the best way to document this?
How to calculate "Area with Direct Line of Sight to the Outdoors via Vision Glazing" without a 90 degree angle?
NC-v4 EQc8:Quality viewsposted by Elissa Wu on
I am working on a project that has two regularly occupied spaces that do NOT have two 90 degree apart windows. I am instead going for Type 2 and Type 4.
Cooling tower cycles
NC-v4 WEc3:Cooling tower water useposted by Manuel Martin Delgado on
Hi, I am a bit confused with the credit requirements for achieving 1 point.
Flushing Out a Hockey Rink
NC-v4 EQc4:Indoor air quality assessmentposted by Cynthia Kaplan on
My project is a new construction hockey arena pursuing Option 1, Path 1 for the flush out. The thing is, we have ice. Ambient temperatures will not be above 60 degrees.
V4 Entrance mats/roll-up mats
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Kathryn Haeberle on
Hi, does anyone know if the v2009 interpretation still applies that the first 3 ft of the 10 ft must be a permanent system (like recessed mat system) and the remainder can be roll-up mats
University Participation in Utility Solar
NC-v4 EAc7:Green power and carbon offsetsposted by Rebecca Aarons-Sydnor on
We are working on a new building at a University that has an existing agreement with the utility to offset 96% of the energy used with utlity-owned solar farms, and all RECs are retired on the Univ
LI 10102 - Letter of Commitment - Register incomplete space separately?
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Deb Favaretto on
Hi,
ASHRAE 55, patient rooms, and metabolic rates
Healthcare-v4 EQc5:Thermal comfortposted by Jim Nicolow on
Our HVAC engineer indicated that ASHRAE 55 cannot be met on a healthcare project because it is not applicable for metabolic rates below 1.0. Isolation room and ICU patients could be sleeping