Forum quick links
surrounding density
NC-v4 LTc4:Surrounding density and diverse usesposted by Poovarasan Subbiah on
1. we are doing a project in which surrounding density is not met but there is a scope for developement in the near feature.Can we consider the points for this surrounding density credit.
NC-v4WEp3
NC-v4 WEp3:Building-level water meteringposted by Janet Matheson on
Can the building owner provide a single letter on sharing usage data for both Building-Level Water Metering and Building-Level Energy Metering?
Do LID Practices need to capture the entire LEED boundary?
NC-v4 SSc4:Rainwater managementposted by Teresa Lin on
Hi All,
Indoor plumbing fixtures and fittings only?
NC-v4 WEc4:Water meteringposted by Amgad Khattab on
f the only subsystem available in the project is (Indoor plumbing fixtures and fittings), Are we eligible to earn this Credit for a core and shell project?
Smoking in a casino floor of a hotel on Native American Land
NC-v4 EQp2:Environmental tobacco smoke controlposted by Summer Gorder on
I am running into an issue pursuing LEED certification due to this prerequisite for a hotel with a casino, but I saw a comment about a code caveat that poses an interesting opporunity for
Casino which allows smoking
NC-v4 EQp2:Environmental tobacco smoke controlposted by Azfar Mohamed on
Good day everyone,
We have a project in the design stage, it is a resort with a casino.
The client is considering LEED certification.
Cooling only system in Baseline case
Schools-NC-v4 EAp2:Minimum energy performanceposted by John on
Hi,
Vegetated Roof or Hardscape?
NC-v4 SSc5:Heat island reductionposted by Tricia Loe on
Our building has a portion of the roof area that is a terrace accessible from the top floor of the building. The terrace contains high-reflectance hardscape and vegetated areas.
WEp1: Ice Machine - ENERGY STAR or performance equivalent?
CI-v4 WEp1:Indoor water use reductionposted by Graeme Smith on
Hi! We understand that in LEEDv4 an ice machine is required to be… “ENERGY STAR or performance equivalent". According to the Energy Star website… “Qualifying (ice machine) models must meet 'maximum
Lighting Zones for BUG method of compliance
NC-v4 SSc6:Light pollution reductionposted by Tricia Loe on
Our project has two buildings on a corporate campus. We plan to use the “BUG” method to show compliance with this credit.