View Type 3 with Permanent Obstruction Near Ceiling

NC-v4 EQc8:Quality views
posted by  Laura Heagler  on 

We have some spaces with vision glazing 12' and 16' head height. The spaces have exposed spiral ductwork.

3
GLMV Architecture, Inc.
LEEDuser Basic Member
1 thumbs up
Wed Jul 21, 2021, 4:01 pm

"Fixed Spray irrigation only permitted on Turfgrass"

NC-v4 WEp1:Outdoor water use reduction
posted by  Green Projects  on 

When the Watersense Water Budget Tool is completed with 'fixed spray' selected as irrigation type for trees and shrubs, it produces a warning in red text that says, "Fixed Spray irrigation onl

1
Thu Jul 29, 2021, 9:53 am
2
Wed Jul 21, 2021, 9:57 am

View type 3. Unobstructed views located within the distance of three times the head height of the vision glazing

NC-v4 EQc8:Quality views
posted by  Keith Robertson  on 

I find the Reference Guide explanation unclear. Page 749 includes a diagram of a compliant open office space and non-compliant open office space.

17
Wed Jul 21, 2021, 1:19 am

Commissioning Fees

NC-v4 EAc1:Enhanced commissioning
posted by  Tom Grassi  on 

I am looking for updated studies with cost data for LEED v4 Commissioning services, including Enhanced, Envelope and Monitoring-Based Commissioning.  "The Cost of LEED v4" is a good publicatio

7
Default Avatar
Green building manager
Confidential
LEEDuser Basic Member
13 thumbs up
Tue Jul 20, 2021, 11:01 pm

trees shading calculation

NC-v4 SSc5:Heat island reduction
posted by  Loic Angot  on 

Project Location : Canada, Ontario

 

Hi,

A question about shading calculation for heat island credit, non-roof measures.

5
Building Enclosure Consultant
BPL Enclosure
LEEDuser Basic Member
58 thumbs up
Tue Jul 20, 2021, 9:18 pm

Heat Island reduction provided by the building itsself

NC-v4 SSc5:Heat island reduction
posted by  Carmen Mielecke  on 

Dear All, if a Project consists of many small courtyyards and shade for those courtyyards is provided by the building structure itsself, Can this in any way be used to contribute to the fulfillment

8
Tue Jul 20, 2021, 8:32 pm

LEED Online Credits not eligible in Innovation in Design Only

NC-v4 RPc1:Regional priority
posted by  Katie Vasbinder  on 

On LEED online the Regional Priority Credits show we are eligible within a
credit threshold (ie. Optimize Energy Performance) but in the Innovation

7
Tue Jul 20, 2021, 6:12 pm
1
Tue Aug 22, 2023, 3:00 pm
1
Mon Jul 26, 2021, 3:24 pm