Forum quick links
LEED Online is not displaying Reginal Priority credit category
NC-v4 RPc1:Regional priorityposted by Norbert Harmathy on
Hello,
We registered a new project under LEED v4 NC. In ALL Credit categories listed, there is NO Regional Priority credit category.
Can we certify only the administrative building in a pharmaceutical factory project?
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Amgad Khattab on
We have a pharmaceutical factory project consists of the following buildings: -
1. An administrative building (Ground + 3).
2. A Production building (Ground +2).
Group Project Scoring
EBOM-v4 EAc7:Renewable energy and carbon offsetsposted by Andy Rhoades on
How do I score EAc7 when certifying for a group project? I have the VER proposals for the three buildings but don't know how to score them together. Thanks!
Remediation of LEED Project Area or only disturbed areas
NC-v4 LTc3:High priority siteposted by Mark Meaders on
We have a project that has had a Phase 1 and II ESA performed. It found there was acetone and mercury on site.
One Product Counting Towards Multiple Credits
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Summer Gorder on
Can one product count towards multiple options and/or credits for more points? How does the bonus credit work if a product has an EPD, and meets LCA requirements for Option 2?
EV Charging Stations
NC-v4 LTc8:Green vehiclesposted by Dianne Herrin on
Hello - My client is preparing to purchase Tesla EV charging stations to meet LEED v4 requirements. These stations will work only with Teslas.
Radiant Temperature
EBOM-v4 EQc3:Thermal comfortposted by Craig Wilson on
What is the difference between air temperature and radiant temperature?
Base case System-8
NC-v4 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
We are working on a project where there are multiple AHU's in the single floor. Few AHU's have MERV-14 filtration and in built HRW. The rest of the AHU's only has MERV-8.
Product meeting multiple MRc4 methodologies
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Van Jomel Garcia on
Hi! Has anyone encountered a product that complies with more than one compliant MRc4 Methodologies?
Option 2 Strategy E for an Atrium area - No ceiling areas (Open to roof deck above)
NC-v4 EQc6:Interior lightingposted by John Covello on
Hello.
For Option 2, Strategy E.