Forum quick links
Surrounding Density - Future Development
NC-v4 LTc4:Surrounding density and diverse usesposted by Laura Smith on
We are working on a project that does not yet meet the density requirement but is expected to see substantial development in the near future.
Legal Wood - Pilot Credit LEEDv4
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Sophie Kerr on
If I have SFI products that make up 100% of my wood products, 25+% of my total materials, and have I completed the survey, have I met the pilot credit?
Clarification on Design Supply Air Temperature for Baseline model with both heating and cooling
NC-v4 EAc2:Optimize energy performanceposted by Anurag Ghosh on
Hello Everyone,
proposed energy savings for unfinished spaces based on local energy code?
CS-v4 EAp2:Minimum energy performanceposted by Erin Holdenried on
Nowadays, many local energy codes are exceeding LEED's ASHRAE 90.1-2010 Baseline. Has anybody successfully claimed energy savings for unfinished tenant spaces based on local code?
Baseline Energy Model - Outside Air Ventilation Rate for Zoo Spaces
NC-v4 EAp2:Minimum energy performanceposted by Mini Laird on
We would like to confirm our approach to determining the outside air ventilation rate for a Zoo project for the Baseline energy model, specifically for an animal holding area.
Baseline Required Outdoor Airflow for Toilets
NC-v4 EAp2:Minimum energy performanceposted by Junaid Mujahid on
Hi Forum Users!
Regd. Primary Secondary Pump Arrangement in PRM Baseline System 8 Modelling
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello All,
ASHRAE 90.1 Section 6.5.3
NC-v4 EAp2:Minimum energy performanceposted by Michael Abramson on
Good afternoon all,
Radon Requirements for LEED v4 - Residential/Dwelling Units
NC-v4 EQp1:Minimum indoor air quality performanceposted by Chris Wilson on
We are working on a five-story student dormitory including a partial basement area in EPA Radon Zone 1. Are we required to follow the guidance for 'residential only' projects in high-risk are
Commuter/Light rail station further than 0.5 miles from project boundary
CI-v4 LTc3:Access to quality transitposted by Aarohi Savani on
I'm working on a access to quality transit(table 2) that has a commuter rail station at 1.6 miles walking distance from the project boundary.