Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Surrounding Density - Future Development

NC-v4 LTc4:Surrounding density and diverse uses
posted by  Laura Smith  on 

We are working on a project that does not yet meet the density requirement but is expected to see substantial development in the near future.

3
Sustainability specialist, LEED AP
Volvo cars
LEEDuser Basic Member
0 thumbs up
Wed Feb 4, 2026, 8:19 am

Legal Wood - Pilot Credit LEEDv4

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Sophie Kerr  on 

If I have SFI products that make up 100% of my wood products, 25+% of my total materials, and have I completed the survey, have I met the pilot credit?

8
Sat Jan 31, 2026, 12:37 am
1
Fri Jan 30, 2026, 4:45 pm

proposed energy savings for unfinished spaces based on local energy code?

CS-v4 EAp2:Minimum energy performance
posted by  Erin Holdenried  on 

Nowadays, many local energy codes are exceeding LEED's ASHRAE 90.1-2010 Baseline.  Has anybody successfully claimed energy savings for unfinished tenant spaces based on local code?

2
Fri Jan 30, 2026, 5:07 pm

Baseline Energy Model - Outside Air Ventilation Rate for Zoo Spaces

NC-v4 EAp2:Minimum energy performance
posted by  Mini Laird  on 

We would like to confirm our approach to determining the outside air ventilation rate for a Zoo project for the Baseline energy model, specifically for an animal holding area.

1
Fri Jan 30, 2026, 4:22 pm
1
Fri Jan 30, 2026, 4:19 pm
7
Fri Jan 30, 2026, 4:16 pm
3
Fri Jan 30, 2026, 3:33 pm

Radon Requirements for LEED v4 - Residential/Dwelling Units

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Chris Wilson  on 

We are working on a five-story student dormitory including a partial basement area in EPA Radon Zone 1.  Are we required to follow the guidance for 'residential only' projects in high-risk are

1
Sat Jan 24, 2026, 7:12 am

Commuter/Light rail station further than 0.5 miles from project boundary

CI-v4 LTc3:Access to quality transit
posted by  Aarohi Savani  on 

I'm working on a access to quality transit(table 2) that has a commuter rail station at 1.6 miles walking distance from the project boundary.

0