Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Watersense Labelled product not listed in EPA Product List

NC-v4 WEp2:Indoor water use reduction
posted by  Shannon Oletic  on 

We have received manufacturer documentation indicating that a lavatory faucet spec'd for one of our projects is WaterSense labelled however, this product is not listed within the EPA's Product

3
Default Avatar
MCW Consultants Ltd
LEEDuser Basic Member
0 thumbs up
Thu Feb 25, 2021, 4:53 pm

Walkable Project Site

NC-v4 INc1:Innovation
posted by  Graciela Quiles Gonzalez  on 

Are facades of existing buildings (not historic) exempt of Requirement number 8 of the Walkable Project Site? 

2
Wed Feb 24, 2021, 6:15 pm

Hot-water design supply and return temperature difference

CS-v4 EAp2:Minimum energy performance
posted by  Przemysław Rejczak  on 

Dear Everyone,

I got a comment for one of our project which in my opinion is not ccompatibe with ASHRAE. We do not have much time for the response, so I decided to ask about it here.

1
Thu Mar 4, 2021, 8:34 pm

Fire Alarm System components and other facility services subgroups systems

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Aaron McEwin  on 

Previous versions of LEED stipulated the Material and Resource Credits only applied to Divisions 2-10 products. 

1
Mon Feb 22, 2021, 3:12 pm

Fire Alarm System components and other facility services subgroups systems

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Aaron McEwin  on 

Previous versions of LEED stipulated the Material and Resource Credits only applied to Divisions 2-10 products. 

1
Mon Feb 22, 2021, 2:56 pm

Advanced Energy Metering, Opt.2 - Data Must Be Remotely Accessible

CI-v4 EAc3:Advanced energy metering
posted by  Graeme Smith  on 

We under that... "The data must be remotely accessible"... but how does USGBC define remote accessibility?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Feb 22, 2021, 9:55 am

Pilot Credits: Safety First - Cleaning and Disinfecting; Re-enter Your Workplace

NC-v4 INc1:Innovation
posted by  Bethany Beers  on 

We interpreted the intent of these two COVID-related pilot credits to be: provide a safe working environment during construction.

0

Base building versus tenant metering

CS-v4 EAp3:Building-level energy metering
posted by  Jens Apel  on 

Maybe I am overly cautious, but I would like to clarify the following.

4
Fri Feb 19, 2021, 3:35 pm

Partial "Lumens above Horizontal" calculation

NC-v4 SSc6:Light pollution reduction
posted by  Jack Ma  on 

Anyone have experience documenting an uplight light fixture with a permanent structure above for “partial lumens above horizontal” calculation, please let me know

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Thu Feb 18, 2021, 8:54 pm