Forum quick links
Naturally Ventilated Warehouse
CS-v4 EQp1:Minimum indoor air quality performanceposted by Micaela Smulevich on
We are currently working on incorporating sufficient strategies to naturally ventilate an industrial warehouse.
partially heated space
Warehouses-NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
In the building I am modelling there is a big warehouse that is heated partially only (where the workers are more active, i.e. close to the loading bays).
Warehouse renovation: insulation required per ASHRAE 90.1-2010?
NC-v4 EAp2:Minimum energy performanceposted by Alessandro Zuanon on
Dear all,
Baseline System type and size
CI-v4 EAp2:Minimum energy performanceposted by Tzung-Han Ho on
Hi all,
Excluded area
ND-Plan-v4 SLLc1:Preferred locationsposted by Blanca de la Fuente on
Hello, I've a doubt regarding the excluded area to calculate the land area within the 800m-boundary, in the guide it is written:
Different stratification in Proposed and Baseline
NC-v4 EAp2:Minimum energy performanceposted by Przemysław Rejczak on
Dear Everyone,
I have a question regarding to 12 m tall warehouse modeling tehnique.
SSc2-Previously disturbed site – 10 years ago
NC-v4 SSc2:Site development - protect or restore habitatposted by Olga Motchalova on
We are going to start project with LEED NC-v4 certification of industrial building in industrial park.
process water - restaurant?
NC-v4 WEc4:Water meteringposted by Agnieszka Rylska on
We have a New construction project - offices with a restaurant on the groud floor. Does anyone know if water use for the purpose of the restaurant can be considered process water?
ASHRAE 90.1-2010 Mandatory Requirements in Existing Buildings
NC-v4 EAp2:Minimum energy performanceposted by Ashley Wisse on
EAp2 requires adherence to ASHRAE 90.1-2010 Mandatory Requirements at Section 5.4 and elsewhere.