Water metering - Lease Agreement
CS-v4 EAc3:Advanced energy meteringposted by CT G on
We are working on a project that provides condensing water for future installation of datacenter AC units for tenants.
Chilled water metering strategy
CS-v4 EAc3:Advanced energy meteringposted by CT G on
We are working on a project that has a chilled water plant, cooling towers, DOAS units that supply cooled outdoor air to Chilled Water Sensible Cooling Terminal Units installed in each thermal zone
ASHRAE 50% Advanced Energy Design Guides is not applicable to the base building.
Hospitality-CI-v4 EAc2:Optimize energy performanceposted by Victor Moreno on
We are using Option 2. Prescriptive compliance
The project is LEED ID+C Hospitality. So, there is not an AEDG for hospitality buildings.
Energy performance substitution from v4.1 to v4
NC-v4 EAp2:Minimum energy performanceposted by Dan Forino on
Hello,
Just trying to wrap my head around this and looking some clarification.
[CI Energy Modeling] Receptacle Energy on Landlord Side
CI-v4 EAp2:Minimum energy performanceposted by Hyerim Kim on
Hi,
My project is a CI project, and scope is 2 story office area(22-24 floor) in a 30floor commercial building.
UK and EU standards compliant with LEED
EBOM-v4 EQp3:Green cleaning policyposted by Lara Coutinho on
Hi, I'm working on the green cleaning policy, what is compatible with the below in the UK?
Controlled Burn?
NC-v4 SSc2:Site development - protect or restore habitatposted by Norma Lehman on
Has anyone ever used a controlled burn to eliminate invasive species?
Residential Building (9-Story)
Mid-Rise-v4 EQp1:Ventilationposted by CT G on
We are working on a 9-story residential project that is being certified v4.1 BD+C: New Construction.
Residential Building (9-Story)
NC-v4 EQp1:Minimum indoor air quality performanceposted by CT G on
We are working on a 9-story residential project that is being certified v4 BD+C: New Construction.