Hi,

I received a Design Review Comment for my project which says:

5
Sustainability Coordinator
Elkus Manfredi Architects
LEEDuser Basic Member
4 thumbs up
Tue Jan 5, 2021, 6:29 pm
5
Thu Dec 31, 2020, 6:12 am

LEED Consultants working in remote mode.

NC-v4 SSp1:Construction activity pollution prevention
posted by  Olga Yuil  on 

As LEED Consultants we are working in remote mode because of COVID-19 risk.

The Project Team is concern about how this may or may not affect the certification.

2
www.afogreenbuild.com
Green Building Consultant
LEEDuser Premium Member
249 thumbs up
Wed Dec 30, 2020, 6:52 pm

Reuse of emergency water for toilet flushing?

NC-v4 WEc2:Indoor water use reduction
posted by  Erin Holdenried  on 

We have a laboratory project with emercency eye wash and shower stations that has a dedicated water supply.  The water in the pipes serving these fixtures must be flushed on a regular basis.&n

1
Wed Dec 30, 2020, 8:01 pm
2
Tue Dec 29, 2020, 10:52 am

Including racks in the assessment

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Agnieszka Kaczmarek  on 

According to Option 4: can I include in the assessment metal racks in a warehouse?

2
Default Avatar
M.Sc.
LCEE Life Cycle Engineering Experts GmbH
LEEDuser Basic Member
20 thumbs up
Tue Dec 29, 2020, 7:36 am

Exterior Building Lighting façade - MANDATORY PROVISIONS ASHRAE 90.1 - 2010

NC-v4 EAp2:Minimum energy performance
posted by  Sara BENLOUBA  on 

We are currently developing a large-scale lighting project for which we need to clear up some doubts about ASHRAE 90.1 regulations – section 9.4 – 2010 regarding exterior facade lighting.

5
Default Avatar
Green building manager
Confidential
LEEDuser Basic Member
13 thumbs up
Mon Dec 28, 2020, 5:48 pm

Manufacturing waste for compliance

Warehouses-EBOM-v4 MRc4:Solid waste management - ongoing
posted by  FARIZAN DAVEZAC  on 

I have a warehouse with a manufacturing area. The waste from the manufacturing area is already being diverted, as it's collected by a recycling facility.

0

Can lab surfaces be excluded?

CI-v4 EQc6:Interior lighting
posted by  Kristen Magnuson  on 

I'm working on a lab TI. The project's work surfaces include both lab tables and typical office-style workstations.

2
Default Avatar
SL+A INTERNATIONAL ASIA INC.
LEEDuser Premium Member
305 thumbs up
Wed Dec 23, 2020, 9:15 pm

Performance period

EBOM-v4 EQc7:Green cleaning - products and materials
posted by  DAVE LI  on 

Does the performance period of the provision only take three months or more?