EBOM-v4 LTc1:Alternative transportationposted by Omar Elrawy on
Is it possible to have the survey conducted before even starting the performance period.
Rainwater events calculator - do I enter days without rainfall events?
NC-v4 SSc4:Rainwater managementposted by Aleksandra Prawda on
Hi all,
Green field but planned for development in an industrial zone
NC-v4 LTc2:Sensitive land protectionposted by Thomas Tan on
Dear All,
I have a project which will be built on a lot located in a industrial zone. The lot is used to be natural land but filled up with sand now.
Existing Campus CEP Cooling Towers
NC-v4 WEc3:Cooling tower water useposted by Gregory Mason on
Hi all,
Defining Outdoor Social Activities
NC-v4 SSc3:Open spaceposted by Dee Spiro on
We've been discussing this internally and have people on both sides of the fence.
How to document the Quality View Simulation Results from IES VE?
CS-v4 EQc5:Quality viewsposted by James Cai on
I have simulated the quality view in the IES VE and created a report according to the simulation results.
Tenancy areas with low relevance
NC-v4 EAc3:Advanced energy meteringposted by Ricardo Sá on
Dear All
ENERGY STAR equipment Wattage
CI-v4 EAc2:Optimize energy performanceposted by Michael d on
When inputting ENERGY STAR equipment wattage, do we include the idle, average or maximum wattage used by the equipment?
EMICODE For US project
NC-v4 EQc2:Low emitting materialsposted by Ante Vulin on
We are working on a US project where a subcontractor has submitted an EMICODE EC1 PLUS certificate to show that a sealant complies with the VOC requirements.