Forum quick links
7.6.1.2 Extracting Fan Power – Baseline Design
NC-v4 EAp2:Minimum energy performanceposted by Amal Venugopal on
Hi Sir,
Greetings!...
Is it ok to have furniture installed when measuring T60 (reverberation)?
CI-v4 EQc9:Acoustic performanceposted by BEE Incorporations on
I suspect it's ok but I just want to be sure because it's not indicated in the LEED Guide. Thank you.
Enhanced Refrigerant Management - TRANE Calculator Issues
NC-v4 EAc6:Enhanced refrigerant managementposted by Daniel Davis on
Project: 3-story student housing in Danville, KY
EA Green Power and Carbon Offsets Credit: What if project net zero; solar panels?
Schools-NC-v4 EAc7:Green power and carbon offsetsposted by LJ Bryant on
Hello! I am working on a school project that is net zero (all energy offset by solar panels on site).
Water Use Reduction: Base Building with existing fixtures
CI-v4 WEp1:Indoor water use reductionposted by Scott Edwards on
Hi - We are working on an interior commercial fit out project in a base building that already has all water fixtures installed.
Several diverse uses inside the airport - can I count these?
NC-v4 LTc4:Surrounding density and diverse usesposted by Aleksandra Prawda on
Hi all,
Lighting fixtures under water
NC-v4 SSc6:Light pollution reductionposted by Manuel Martin Delgado on
Hi,
Are all listed ISO standards required
CS-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Ward Miller on
Apologies if this seems super basic, but we have yet to have a LEEDv4 project reviewed and we would appreciate some peer input!
Option 1 Path 2 - What's Been Your Experience?
NC-v4 EQc4:Indoor air quality assessmentposted by Cynthia Kaplan on
Hi all,
Show of hands for those that have used Option 1, Path 2, post occupancy flush out:
Do you provide trending data for both phases, or just the preliminary phase?
Mixed Model, Mechnical ventilation design
NC-v4 EQp1:Minimum indoor air quality performanceposted by Sandra Lee on
Hello all: I am a newbie here so may this question was brought up. We have a building with a canteen for workers.