Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Private shuttle

NC-v4 LTc5:Access to quality transit
posted by  Dora Rebola  on 

We have an office building and retail that is located in an area that provides a good public transport services during the week, but not on the weekends.

1
Thu Sep 10, 2020, 12:21 pm

EQc6 - Interior Lights (ROS & LRV conflicts)

NC-v4 EQc6:Interior lighting
posted by  Olawale Taiwo  on 

There is quite an issue of concern on LRV weighted average calculations on our project per the EQc6 credit, as the project team requires an urgent response to this, please see details bel

1
Thu Sep 10, 2020, 4:17 pm

Uplight requirements

NC-v4 SSc6:Light pollution reduction
posted by  Ricardo Sá  on 

Dear All,

 

In what refers to uplight requirements – Option 2 (calculation method) implies limits to the percentage of total lumens emitted above horizontal.

 

1
Wed Sep 2, 2020, 7:02 pm

Can I use a mezzanine in MRF to add floor area?

CS-v4 MRp1:Storage and collection of recyclables
posted by  Van Jomel Garcia  on 

I have a question regarding MRF, the minimum size calculated for the MRF is 47 sqm.

0

Below grade levels or partially below grade

Healthcare-v4 EQc8:Quality Views
posted by  Mauricio Toro  on 

The LEED guide in the perimeter area explanation section says:  "Below-grade walls with areaways and walls that abut adjacent buildings are excluded".

0
0

Government Required Irrigation - Exemption?

NC-v4 WEc1:Outdoor water use reduction
posted by  Sara Goenner Curlee  on 

One of my projects is being required to do some frontage improvement work along with the project itself.

1
Thu Sep 10, 2020, 4:52 pm

Rainwater cleaned in a swales and drained into a nearby lake to preserve it

NC-v4 SSc4:Rainwater management
posted by  Pooja Sannamani  on 

Our project consists of a building in a waste water treatment plan (WWTP) facility.

1
Thu Sep 10, 2020, 4:45 pm