European ACP Dimming
CS-v4 EAp2:Minimum energy performanceposted by Przemysław Rejczak on
Dear Everyone,
Interior Irrigation?
NC-v4 WEp1:Outdoor water use reductionposted by Allison Wilson on
Our project has interior planting which will be irrigated.
Solar Panels
CI-v4 EAc1:Enhanced commissioningposted by Alexis Voeltner on
Do solar panels that are being installed by the building owner need to be commissioned before the LEED submittal or can the commissioning be done later?
Multi Attribute Optimization
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Vibha Pai on
Is there any USGBC approved program which would help projects achieve credit points pursuing the option 2 multi attribute optimization of MR BPDO-EPD? Thanks in advance!
Mass Floor vs. Slab below grade for CSv4 - Prescriptive Approach
CS-v4 EAc2:Optimize energy performanceposted by Kena David on
We are pursuing CSv4 for a project and using the prescriptive approach for Optimize Energy Performance.
IP-based control system tied to individually controlled fixtures overhead
NC-v4 EQc6:Interior lightingposted by Ciaran McCabe on
Has anoyone gained Option 1 using an IP based control system. If every light fitting can be controlled via an IP based system will this achieve complaince with Option.
Public Project Currently Purchasing REC's for all Electricity for all Building looking to add Natural Gas Carbon Off-sets
NC-v4 EAc7:Green power and carbon offsetsposted by Summer Gorder on
I am working on a few projects for a public agency that purchases REC's for all of their buildings electricity, and they would like to add natural gas.
Vegetated external shades
CS-v4 EAp2:Minimum energy performanceposted by Maria Grimm on
I am working on a project that is designing external vegetated shades/screens. For local code compliance, we are not allowed to include the vegetated shades in our energy model.
NC / CS Mix
NC-v4 EAp2:Minimum energy performanceposted by Maria Grimm on
Question regarding a project that is registered as NC. The project is a approximately 70% residential (NC) and 30% core & shell office.
Envelope commissioning
NC-v4 EAc1:Enhanced commissioningposted by Ricardo Sá on
Dear All,
In the context of a large new Office Building (22 000 m2) which field-tests are required as a minimum under the scope of Building’s Envelope Commissioning?