Forum quick links
Tolerance within the achievement of criterias due to different affectations
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Audrey LEDESERT on
Hi,
I'm working on a project with administration affectation and some commercial surfaces on the groundfloor (surface < 40% of the total project surfaces).
Definition of Short term and Long Term bike storage
NC-v4 LTc6:Bicycle facilitiesposted by Martin Stowell on
How does LEED define short term and long term bike storage? What are some examples of each? This is for a NCV4 Core and Shell project. Thanks.
Tenants using energy supplier meters
CS-v4 EAc3:Advanced energy meteringposted by Ricardo Sá on
Dear All,
We are currently certifying a large office building using LEED v4 BD+C Core & Shell.
Project without landscape area
NC-v4 WEc1:Outdoor water use reductionposted by Azfar Mohamed on
Hello everyone,
Currently, we have a manufacturing facility registered for LEED NC BD+C V4.
This project does not have any landscape area at the moment.
Carpets with the same GLP Certification
CI-v4 EQc2:Low emitting materialsposted by Michelle Rosenberger on
Carpet products seem to typically have Green Label Plus certificates that refer to the carpet backing being used, rather than any particular carpet style or product name.
LEED ID+C, V4, Retail shop in a mall
Retail-CI-v4 EAp2:Minimum energy performanceposted by Toshif Ruikar on
Hi, My project is an retail shop in a big mall.
LEED EBOM v4 minimum occupancy requirements
EBOM-v4 EAp2:Minimum energy performanceposted by on
Hello,
Does LEED EBOM v4 require a minimum occupancy requirement to be able to be certified?
Mixed use buildings minimum storage spaces
NC-v4 LTc6:Bicycle facilitiesposted by Yara Salama on
Hello,
Stores without connection to main building
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Ricardo Sá on
Dear All,
Energy Star Target Finder Outside US?
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
Marcus wrote this in the forum relative to CI-v4 EAp2: "Projects outside the US are not required to produce a Target Finder score".
Is that valid for BD+C as well?