Full Occupancy Calculations
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Giovani Bernal on
Our project is a 24 level office building. At least 75% of occupancy has been reached.
Excluding entrance halls from calculations
Hospitality-NC-v4 EQc7:Daylightposted by Ricardo Sá on
Dear All,
PVC Welding Cement
NC-v4 EQc2:Low emitting materialsposted by Kerry Honsinger on
Anyone come up with a PVC Welding Cement that meets the CDPH Standard Method v1.1 -2010 emissions requirement?
Short and Long Term Together?
NC-v4 LTc6:Bicycle facilitiesposted by Summer Minchew on
Can short and long term spaces be located together as long as all other requirements are met?
Bipolar Ionization devices; documenting reduced outside air quantities
Schools-NC-v4 EQp1:Minimum indoor air quality performanceposted by on
I have a new school project which currently has ionization devices throughout the HVAC RTUs. These ionization devices reduce the required outside air.
IES thermal block and baseline model with system 6
NC-v4 EAc2:Optimize energy performanceposted by Ying Lindsey on
Dear all,
I need your professional opinion about a project that I am currently working on.
Supervisor can hire Cxa?
NC-v4 EAp1:Fundamental commissioning and verificationposted by Vanessa Montezuma Ramos on
We are participating in a Design-Build project of more than 20,000 ft2. Can the supervisor of the general contractor hire the Commissioning Agent?
Process HVAC modeling approach
NC-v4 EAc2:Optimize energy performanceposted by Pooja Sannamani on
Hi, we are consisering options for our high process load building in meeting the minimum requirements of the energy credit.
South-East Asia Alternative Compliance Path for ASHRAE 90.1-2010
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by dianti avo on
Hello,
Is there any Alternative Compliance Path for ASHRAE 90.1-2010 (mandatory provision) for South-East Asia region?
Thanks!
Approach to LCA
NC-v4 MRc1:Building life-cycle impact reductionposted by Barbora Cicvárková on
Hi to all,
we would like to discuss a question about determining baseline and proposed building to meet LCA credit's requirements and meet the whole credits intent.