Total annual energy consumption in complex railway station in India
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
The railway station has one entry building which is connecting by foot over bridge with platforms.
Recommened software for doing the Interior and Daylighting analyses.
NC-v4 EQc7:Daylightposted by Jorng-ren Chern on
We’re in search for a suitable software to do the Interior and daylighting analyses for LEED V4.
STC requirement for a Retail area next to a hallway in a medical building
NC-v4 EQc9:Acoustic performanceposted by Todd Bundren on
We are working on a new medical buidling (cancer center) and there is a gift shop off a large corridor close to the main entry.
Help needed with ARC platform
EBOM-v4 MPR1:Must be in a permanent location on existing landposted by Antonio de Sousa Filho on
Hi everyone,
Fresh air handling unit filters
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Karim Farah on
If a project has filters of MERV 7, what is the procedure done to earn minimum indoor air quality prerequisite? Given that LEED requires MERV 11 or more.
Regarding ASHRAE 90.1 2013 Fan Power Calculator_Excel Sheet
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello Everyone,
Can anyone share me the ASHRAE 90.1 2013 Fan Power Calculator excel sheet for baseline model. I am unable to find it anywhere.
Sourcing of Raw Materials location requirements
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jason Grant on
On May 7, 2014, Christine asked a question about how to meet Option 1 requirements related to reporting of "raw material supplier extraction locations" but it doesn't seem to me that it was ever an
Guidance on Green Wall Irrigation Requirements
Data-Centers-NC-v4 WEc1:Outdoor water use reductionposted by Venkatkrishnan Ashok on
Hello,
LEED v4 BD+C, EAc1 Enhanced Cx, Option 2. Envelope Cx: Can General Contractor contract for the BECx testing?
NC-v4 EAc1:Enhanced commissioningposted by Theresa Lehman on
Has anyone come across a scenario where the general contractor is required to contract for the functional testing of the building envelope commissioning, where the hired BECx simply "observes" the
Taking account for thermal brigdingt of construction joints/egde
NC-v4 EAp2:Minimum energy performanceposted by Sonja Kildishev on
I wonder if/how thermal bridging of joints/egde between constructions should be included in the U-value of the construction?