Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent
2
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Mon Apr 6, 2020, 3:39 pm

DCV in baseline system

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

If Demand Control Ventilation is required in the baseline system, shall the air flow rate be increased when it's useful in order to reduce the cooling demand or shall the control of the outdoor air

1
Wed Apr 15, 2020, 5:09 pm

LEED Project boundaries with Shared Elevator/Restroom Cores/Lobby

CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  Brian Kish  on 

I am working in a 9 story, existing building in downtown Pittsburgh, PA.  Our client has 3.5 floors of area that is part of our project scope of work.  The lobby, restrooms, elevators/sta

1
Tue Apr 7, 2020, 5:13 pm

LEED v4.1 makes changes for commingled waste in Option 1 - What do you think?

NC-v4 MRc5:Construction and demolition waste management
posted by  RETIRED   on 

I'm hopeful that everyone on this forum has seen the BD+C LEED v4.1 new language for MRc5 regarding commingled waste in the current draft, which as of yesterday is no longer a draft - 

17
Sun Apr 5, 2020, 4:42 pm

Spray foam fireproofing = "fire-proofing coatings" per SCAQMD Rule 1113?

NC-v4 EQc2:Low emitting materials
posted by  Renee Shirey  on 

Does anyone know for sure how spray foam fireproofing (for structural steel members) is categorized for VOC content?  My educated guess was fire-proofing coatings, but wasn't positive.&nb

3
Fri Apr 3, 2020, 9:20 pm
2
Sustainability Enabler
Eskew+Dumez+Ripple
LEEDuser Basic Member
20 thumbs up
Thu Apr 2, 2020, 2:31 pm
1
Tue Apr 7, 2020, 2:35 pm

Quality Views LEED Calculator - Multiple View Types, Same Space

NC-v4 EQc8:Quality views
posted by  Tahani Khalid  on 

When finding the area of compliance for a single room under multiple view types, does the regularly occupied space that is entered for that space change?

0