EPD's for Assemblies
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Katelyn Adley on
Hello,
DCV in baseline system
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
If Demand Control Ventilation is required in the baseline system, shall the air flow rate be increased when it's useful in order to reduce the cooling demand or shall the control of the outdoor air
LEED Project boundaries with Shared Elevator/Restroom Cores/Lobby
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Brian Kish on
I am working in a 9 story, existing building in downtown Pittsburgh, PA. Our client has 3.5 floors of area that is part of our project scope of work. The lobby, restrooms, elevators/sta
LEED v4.1 makes changes for commingled waste in Option 1 - What do you think?
NC-v4 MRc5:Construction and demolition waste managementposted by RETIRED on
Spray foam fireproofing = "fire-proofing coatings" per SCAQMD Rule 1113?
NC-v4 EQc2:Low emitting materialsposted by Renee Shirey on
Does anyone know for sure how spray foam fireproofing (for structural steel members) is categorized for VOC content? My educated guess was fire-proofing coatings, but wasn't positive.&nb
Electric vehicles under campus appoach
NC-v4 LTc8:Green vehiclesposted by Instra Ingenieros on
Hi all,
Demand Controlled Ventilation
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings,
Quality Views LEED Calculator - Multiple View Types, Same Space
NC-v4 EQc8:Quality viewsposted by Tahani Khalid on
When finding the area of compliance for a single room under multiple view types, does the regularly occupied space that is entered for that space change?