Group or single project for Warehouse
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Sofia Barahona on
We are currently working on a warehouse which has a total of 12,704.13m2, the project consist of a building of storage and operative offices with a total of 12,516.67m2 and a small separate spaces
62 2010 MZ Calc excel for LEED v 4.
CI-v4 EQp1:Minimum indoor air quality performanceposted by Sadaf Alam on
Hi ,
Does anyone have 62 2010 MZ Calc excel for LEED v 4.
Track light power consumption
Retail-CI-v4 EAp2:Minimum energy performanceposted by Mahesh Shankar on
This one is a retail project in Thailand. The store has many tracklights due to which we are not able to get the required power savings in lighting.
Submitting evidence in design or post-construction stage
NC-v4 EQc9:Acoustic performanceposted by Greenlab on
Hi,
We are in the process of replying to a LEED Certification Review – split review, design stage – of a building which is now close to completion.
Energy Model Room category for server room relevant in baseline building
NC-v4 EAc2:Optimize energy performanceposted by Benjamin Weise on
We're modelling an office building (space by space method) with a relatively big server room (50kW).
Functions of the same product
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Hashir Usman on
Hi all,
Clarification Re. General Emissions Requirement for Multi-part Acoustical Wall Treatment
NC-v4 EQc2:Low emitting materialsposted by Vanessa Nelson on
We have a project with sound recording studios with drywall throughout and an acoustical wall treatment that will be assembled on site and attached to select portions of the drywall.
Industry-Wide EPD - error in description?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Megan White on
Hi all, In the ref guide (p.514), it states that as part of Industry Wide EPD "the manufacturer is explicitly recognized as a participant by the program operator." However, this is the same exact
Tenant-level energy simulation
Retail-CI-v4 EAp2:Minimum energy performanceposted by Iqbal Khalilullah on
Dear All,
We wish to clarify on the tenant-level energy simulation for our single floor project located within 40 floors of high rise base-building.
Question on who can fill the role of a CxA for enhanced commissioning
NC-v4 EAc1:Enhanced commissioningposted by A.J. Speicher on
Hello. I had a question about who can fill the role as the CxA for the enhanced credit. The case is where an engineering firm was hired by the architect to complete the civil/land devel