Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

seperate control of presentation walls in small rooms

NC-v4 EQc6:Interior lighting
posted by  Benjamin Weise  on 

Hi! There are big medium and small meeting rooms featuring presentation walls. They all have direct lighting from above the tables.

3
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Mon Feb 17, 2020, 6:39 pm

Multiple mode

Retail-NC-v4 EQc6:Interior lighting
posted by  Francesco Passerini  on 

In the form in leedonline for Sales areas lighting controls as "Lighting Control Type" the option "Multiple mode" is present. What is the definition of Multiple mode?

Regards

0
6
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Sat Feb 15, 2020, 11:23 pm

Does Hardware need to be included in the Walls category?

NC-v4 EQc2:Low emitting materials
posted by  Renee Shirey  on 

Since hardware (locksets, closers, kickplates) is installed on a door, and a door is part of the Walls category, is hardware required in the Walls category?  I am leaning towards 'Yes", b

3
Construction Administrator/ LEED AP
Bywater Woodworks, Inc.
LEEDuser Basic Member
42 thumbs up
Fri Feb 14, 2020, 10:02 pm

Minimum flow setting and the design cooling flowrate

CI-v4 EQp1:Minimum indoor air quality performance
posted by  kin bong poon  on 

""It appears that the Ventilation Rate Procedure (VRP) calculations may not have been performed for the worst-case conditions, as it is not clear if the cooling condition calculations analyze the l

1
Tue Aug 9, 2022, 11:37 am

Projects with no associated off-street parking

CS-v4 LTc7:Reduced parking footprint
posted by  Esteban Martinez  on 

The team has the following doubt: at the LEED guide says that the project allowable parking must be less or equal to minimum code, but then says that if the project is not associated to off-street

4
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Fri Feb 14, 2020, 1:46 pm
3
Principal
ME Engineers
LEEDuser Premium Member
29 thumbs up
Fri Feb 14, 2020, 1:25 pm
3
Default Avatar
Bovis Project Management SA de CV
LEEDuser Basic Member
1 thumbs up
Thu Feb 13, 2020, 7:42 pm

Light reflection from the facade

NC-v4 SSc6:Light pollution reduction
posted by  Agnieszka Rylska  on 

Ligting engineer asked me if he should include light reflection from the facade in the ligthing simulation for Light trespass Option 2. Could anyone confirm this?

1
Thu Feb 13, 2020, 1:35 pm

Squat WC using manual flushing

Warehouses-NC-v4 WEp2:Indoor water use reduction
posted by  Iqbal Khalilullah  on 

Dear All,

We have 2 nos of squat toilet within the development for the security and driver room. However, the flushing system will be manual using bucket. 

1
Fri Feb 14, 2020, 5:21 am