Baseline for Manufacturing facility energy usage...

NC-v4 EAc2:Optimize energy performance
posted by  Rick Alfandre  on 

We are dealing with a manufacturing facility that has energy intensive process loads.   Is there a standard way to establish a base case for manufacturing process loads?   

1
Fri Feb 14, 2020, 5:23 pm
2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Feb 10, 2020, 3:30 am

pursuing Renewable Energy and Green Power with the v4.1 credit substitution path

NC-v4 EAc5:Renewable energy production
posted by  Cindy Quinn  on 

I am working on a v4 project that is about to submit for final construction review.  We must reach Gold and are right on the threshold, going in with 62 points, if all are earned.  We don

1
Fri Feb 7, 2020, 7:02 pm

Inherently Non-Emitting vs. Zero VOCs

NC-v4 EQc2:Low emitting materials
posted by  Michelle Rosenberger  on 

We have done 8 previous LEED 2009 Gold projects that were pursuing Redlist constraints on top of LEED.

5
Default Avatar
Reynolds Ash and Associates
LEEDuser Basic Member
5 thumbs up
Fri Feb 7, 2020, 4:34 pm

Item C Filtration under Option 1.

CI-v4 EQc1:Enhanced indoor air quality strategies
posted by  Hannah Wong  on 

The requirement mentioned that ventialtion system that supplies outdoor air to occupied spaces must has particle filters or air-cleaning device that has filtration media meeting MERV 13 or higher.&

2
Director of Sustainability, Wellness, & ESG
BCCI Construction, LLC
LEEDuser Basic Member
4 thumbs up
Fri Feb 7, 2020, 3:02 am

Baseline Building

Hospitality-NC-v4 EAp2:Minimum energy performance
posted by  VICTOR MORENO  on 

what ASHRAE Standard we use to create baseline building of one floor bungalow (hotel)?

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Feb 6, 2020, 4:06 pm

Pilot Credit - Green Training

NC-v4 INc1:Innovation
posted by  Philippa Cameron  on 

Hi. Does anyone know if it is feasible to successfully meet the requirements for Pilot Credit 'Green Training for Contractors' on international projects?

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Feb 6, 2020, 3:49 pm