Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Pre-consumer/post consumer Aluminum Recycled Content

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Trey Jones  on 

If the manufacturing process I am involved with consumes aluminum coil to produce our end product can we use the internal scrap percentage of the aluminum reused/reverted at the mill as either pre

4
Mon Feb 10, 2020, 10:03 pm

SSc4 - Special Site Strategies beyond LEED v4 criteria (Rainwater Management + Industrial waste-water considerations)

NC-v4 SSc4:Rainwater management
posted by  Olawale Taiwo  on 

PROJECTS THAT ARE PART OF A MULTI-TENANT COMPLEX ONLY
The credit requirements may be met using a coordinated approach affecting the defined project site that is within the

0
2
Mon Feb 10, 2020, 7:33 pm
1
Tue Feb 11, 2020, 4:27 pm

Baseline for Manufacturing facility energy usage...

NC-v4 EAc2:Optimize energy performance
posted by  Rick Alfandre  on 

We are dealing with a manufacturing facility that has energy intensive process loads.   Is there a standard way to establish a base case for manufacturing process loads?   

1
Fri Feb 14, 2020, 5:23 pm
2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Mon Feb 10, 2020, 3:30 am

pursuing Renewable Energy and Green Power with the v4.1 credit substitution path

NC-v4 EAc5:Renewable energy production
posted by  Cindy Quinn  on 

I am working on a v4 project that is about to submit for final construction review.  We must reach Gold and are right on the threshold, going in with 62 points, if all are earned.  We don

1
Fri Feb 7, 2020, 7:02 pm

Inherently Non-Emitting vs. Zero VOCs

NC-v4 EQc2:Low emitting materials
posted by  Michelle Rosenberger  on 

We have done 8 previous LEED 2009 Gold projects that were pursuing Redlist constraints on top of LEED.

5
Default Avatar
Reynolds Ash and Associates
LEEDuser Basic Member
5 thumbs up
Fri Feb 7, 2020, 4:34 pm

Item C Filtration under Option 1.

CI-v4 EQc1:Enhanced indoor air quality strategies
posted by  Hannah Wong  on 

The requirement mentioned that ventialtion system that supplies outdoor air to occupied spaces must has particle filters or air-cleaning device that has filtration media meeting MERV 13 or higher.&

2
Director of Sustainability, Wellness, & ESG
BCCI Construction, LLC
LEEDuser Basic Member
4 thumbs up
Fri Feb 7, 2020, 3:02 am